Skip to playerSkip to main content
Marcos orders revival of spillway project

After the intense flooding experienced in Las Piñas City over the weekend due to the southwest monsoon, President Ferdinand Marcos Jr. orders the Department of Public Works and Highways to revisit the long-delayed spillway project. During the inspection of the high vacuum self-priming drainage trailer pump placed at the Alido Bridge, Zapote River in Las Piñas City on Aug. 10, 2026, Marcos said the government must fast-track the completion of the spillway, a project stalled for more than a decade, to provide a permanent outlet for floodwaters in Metro Manila.

VIDEO BY ALLEN LIMOS

Check out our Streaming Channel: https://streaming.manilatimes.net/

Subscribe to The Manila Times Channel - https://tmt.ph/YTSubscribe

Visit our website at https://www.manilatimes.net

Follow us:
Facebook - https://tmt.ph/facebook
Instagram - https://tmt.ph/instagram
Twitter - https://tmt.ph/twitter
DailyMotion - https://tmt.ph/dailymotion

Subscribe to our Digital Edition - https://tmt.ph/digital

Check out our Podcasts:
Spotify - https://tmt.ph/spotify
Apple Podcasts - https://tmt.ph/applepodcasts
Amazon Music - https://tmt.ph/amazonmusic
Deezer: https://tmt.ph/deezer
Tune In: https://tmt.ph/tunein

#TheManilaTimes
#TMTNews
#Floodcontrol
#Philippines

Category

🗞
News
Transcript
00:00Ayon mo, baka nga nagkaroon naman ng effect.
00:02Hindi ganun ka kalala ang pagbaba. Medyo nabawasan.
00:08Dati hanggang sa dip-dip diba, dip-dip diba.
00:11Young dip-dip diba baabot. Ngayon, wala pa, hindi pa.
00:15Hanggang ngayon, kulang pa sa tubod ang maha.
00:19So effective naman ang ating ginagawa
00:21ngunit alam naman natin kulang pa rin yan.
00:24Maraming pa rin tayong nga kailangan gawin.
00:26Ito ngayon sa dredging, ngayon lang tayo nag-dreds ulit na tinigil ng moratorium sa dredging for 12 years.
00:34So 12 years walang dredging.
00:36Kaya't pababaw ng pababaw yung mga ilog natin, yung mga spillway natin.
00:41Speaking of spillway, kailangan na talaga natin tapusin yung spillway dito sa Las Piñas para may labasan yung tubig.
00:50At matagal na natigil ang planong yan. That plan has been in the works for, I don't know, more than
00:5610 years.
00:57Pero for whatever reason, hindi natin nabuo. At ngayon, kailangan gagawin na natin.
01:03So I've given instructions to Secretary Vince na tignan nabog na natin, balikan na natin ang mga plano.
01:11Tignan natin kung may kailangan palitan.
01:13But whatever it is, kung anong kailangan gawin, kailangan po tapusin na natin, ilagay na natin yung spillway.
01:20Malaking, malaking bagay yan para sa pagbabahan ng NCR.
01:25Ang isa pang issue na nakita natin ng nangyari ay yung nagbabaan yung sa paranyakinado,
01:32ay yung nagbabaan ng basura.
01:35Napitanon niyo yung mga picture na punong-puno yung kanal.
01:41Punong-puno ng basura na hindi naman galing sa paranyaki, galing sa ibang lugar yun.
01:46Pero dahil napuksan na yung ating mga kanal,
01:51dahil doon napasok, sinasabay ang panang-high tide,
01:54kaya naibit yung mga basura doon.
01:56Kaya nanatawagan kami sa lahat ng involved,
02:00ang ating mga local government unit,
02:02ang ating lahat ng mamamayang Pilipino.
02:05Mag-ingat po kayo dahil ang laking pinsala ang nangyayari kapag yung basura natin.
02:10Ay hindi maganda ang pagtapon at kung saan-saan nalang nilalagay.
02:17Tayo naman, kami naman dito sa pamahalaan,
02:20ay itutuloy na natin yung waste to energy na program.
02:25Yun yung kinukuha yung basura.
02:27At ito ay pinaprocess at ginagawang na kuryente.
02:32At napakalaking bagay na pagkatapos na natin.
02:35Sandali lang siguro yan kasi understood technology na yan.
02:39Ngunit, patuloy pa rin ang ating mga ginagawa,
02:41yung anti-contract, yung ating kontrabaha,
02:44yung project natin na naroon,
02:45at patuloy pa rin ang drenching,
02:47pati kasama ang LCU,
02:49at ang LCU ay nakakasama na rin natin sa drenching.
02:53At makikita natin ang effect na ito.
02:56Kaya, kahit may bahapan ng kaute,
03:00ay malaki kang binawas,
03:02hindi na ganun kalalim.
03:03Una-una.
03:04Pangalawa, mas mabilis, mawala yung tubig.
03:07Dahil nga, napuksan na natin ang ating mga kanal.
03:10Patuloy ang ating gagawin ito,
03:11dahil hindi pa tapos ang trabaho.
03:13Marami pa tayong gagawin.
03:15Ngunit, effective,
03:17buka namang effective yung ating nagawa na,
03:19na nasimula nitong taon na ito.
03:21Hindi natin titigilan hanggang matapos yan.
03:24Ang drenching, talagang walang tigil yan.
03:25Tuloy-tuloy yan.
03:26At hanggat magawa natin ng paraan
03:30na maipon yung tubig bago pa bumaba.
03:33Yun ang talagang long-term plan dyan.
03:36Kaya, patuloy ang ating mga pinaplano
03:39para sa blood control.
Comments

Recommended