Developer is ordered to pay RM1.65 million in costs after failing to prove that the engineer, contractor and insurer were liable for demolition and reconstruction losses.

Read More:
https://www.freemalaysiatoday.com/category/nation/2026/07/27/court-dismisses-mah-sing-unit-s-rm40-7mil-claim-over-building-defects

Laporan Lanjut:
https://www.freemalaysiatoday.com/category/bahasa/tempatan/2026/07/27/tuntutan-rm40-67-juta-anak-syarikat-mah-sing-berkait-kecacatan-bangunan-ditolak

Free Malaysia Today is an independent, bi-lingual news portal with a focus on Malaysian current affairs.

Subscribe to our channel - http://bit.ly/2Qo08ry
------------------------------------------------------------------------------------------------------------------------------------------------------
Check us out at https://www.freemalaysiatoday.com
Follow FMT on Facebook: https://bit.ly/49JJoo5
Follow FMT on Dailymotion: https://bit.ly/2WGITHM
Follow FMT on X: https://bit.ly/48zARSW
Follow FMT on Instagram: https://bit.ly/48Cq76h
Follow FMT on TikTok : https://bit.ly/3uKuQFp
Follow FMT Berita on TikTok: https://bit.ly/48vpnQG
Follow FMT Telegram - https://bit.ly/42VyzMX
Follow FMT LinkedIn - https://bit.ly/42YytEb
Follow FMT Lifestyle on Instagram: https://bit.ly/42WrsUj
Follow FMT on WhatsApp: https://bit.ly/49GMbxW
------------------------------------------------------------------------------------------------------------------------------------------------------
Download FMT News App:
Google Play – http://bit.ly/2YSuV46
App Store – https://apple.co/2HNH7gZ
Huawei AppGallery - https://bit.ly/2D2OpNP

#FMTNews

Category

🗞
News
Transcript
00:00The High Court has dismissed a RM40.67 million lawsuit filed by a massing group subsidiary over cracks found in
00:07a residential block and adjoining multi-storey car park in Rawang.
00:11Justice Azlan Sulaiman ruled that elite park development failed to prove the defects were caused by negligent structural design, poor
00:19construction or substandard materials.
00:21The dispute involved a 10-storey apartment block and car park at the M Residence 2 Township, where cracks appeared
00:28in several transfer beams after construction.
00:31Instead of repairing the defects, the developer demolished the entire car park and up to 90% of the apartment
00:37block before suing structural engineer Zulkibli Abu Bakar, main contractor Pembinaan Infrastruktur OKH Sendirian Berhad and insurer Loan Pack Insurance
00:47Berhad.
00:48Justice Azlan said the only expert report available when the decision to demolish structures was made had recommended repairs, while
00:55no company executive or board member testified to explain why the buildings were torn down instead.
01:00Azlan also rejected the claim against the main contractor after finding that the developer had demolished the structures before an
01:08expert could properly investigate them.
01:10The judge also ruled that the insurer was not liable because the losses did not arise from an unforeseen event
01:16covered under the policy.
01:18Elite Park was ordered to pay RM1.65 million in legal costs to the three defendants, while the engineer was
01:24awarded RM114,088.23 in outstanding professional fees.
01:30Moon Joon Young, FMT