Skip to playerSkip to main content
  • 10 years ago
This project utilized both the PMLS and SPMT units to lift and install an RCP Motor in a Nuclear Power Plant. Note the fully loaded deck which secures the load above versus a suspended load below a hook. Contact eddy@EngineeredRigging.com or visit us at www.EngineeredRigging.com
Be the first to comment
Add your comment

Recommended