Autodesk Navisworks Complete Tutorial | BIM Coordination, Clash Detection & Model Review

Learn Autodesk Navisworks from Beginner to Advanced with this complete official Autodesk Quick Start Guide. This tutorial covers the essential tools and workflows for BIM coordination, 3D model navigation, model integration, clash detection, and project review.

Topics Covered:

1. Discover Autodesk Navisworks
2. Navigate the User Interface in Navisworks
3. Explore Options and Viewpoints
4. Manage Element Display
5. Combine Multiple Models into One Project
6. Display Grids and Levels and Adjust Grid Mode
7. Measure Models
8. Communicate Design Issues Using Review Tools
9. Create a Clash Test
10. Review Clashes
11. Assign Clashes

Learn Professional BIM Coordination Workflows:
- 3D Model Coordination
- Multi-Discipline Model Integration
- Clash Detection and Management
- BIM Model Review
- Design Issue Management
- Construction Coordination

Follow this complete Autodesk Navisworks learning series to improve your BIM modeling and coordination skills.

Subscribe to Autodesk 786 for more free Autodesk tutorials, BIM modeling, Civil 3D, Revit, Navisworks, and infrastructure design training.

#AutodeskNavisworks #NavisworksTutorial #NavisworksManage #ClashDetection #BIM #BIMCoordination #BIMModeling #3DModelCoordination #Autodesk #ConstructionBIM #ModelReview #Autodesk786
Transcript
00:00This is a powerful tool used across the architectural, engineering, and construction industries for project review, coordination, and clash detection.
00:21It enables you to combine 3D models from different design tools into a single unified project environment.
00:30This helps you to visualize, simulate, and analyze your models, improving collaboration and preventing costly errors.
00:39A critical part of Navisworks is clash detection.
00:44This feature identifies when different parts of a building design, such as plumbing, HVAC, or structural components, overlap in ways
00:54that would create issues during construction.
00:57This makes Navisworks an invaluable resource for ensuring that projects run smoothly, saving time and money.
01:06There are three main versions of Navisworks, each tailored for different needs.
01:13Navisworks Freedom is a viewer-only free version that allows you to view models and navigate through them in 3D.
01:20It is perfect for team members or clients who only need to see the model, without making changes.
01:27However, it does not have the ability to perform simulations or clash detections.
01:34Navisworks Simulate includes all of the features except for clash detection and issues integration.
01:41It provides tools for model simulation, project scheduling, and 4D construction visualization.
01:50This version is ideal for project planners and coordinators who need to create animations or walkthroughs to visualize project progress,
01:58but do not need clash detection capabilities.
02:03Navisworks Manage includes everything in Simulate with the addition of clash detection and issues integration, making it the most complete
02:11version.
02:13You can automatically detect and resolve clashes between different building systems before construction starts.
02:22Issues integration with Autodesk Construction Cloud and Revit helps to integrate and inform issues across teams.
02:31This version is a must-have for coordination managers and BIM teams working on large, complex projects.
02:39When you are running Navisworks, you may need to install it in another language.
02:45To run Autodesk Navisworks in another language, you can either install Navisworks with a standalone installer, use a custom install
02:54from Autodesk account, or switch between languages.
02:59To switch between languages, right-click the Navisworks shortcut and select Properties to open the Navisworks Properties dialog.
03:10On the shortcut tab, in the target field, type a space in the target field after roamer.es
03:16Open, dockable windows, dialog boxes, and context menus, in which you complete tasks.
03:25When you open Navisworks, you see a familiar layout, with a focus on 3D model viewing, analyzing, and coordinating.
03:35At the top left is the application menu, which is used to access commands like New and Open, as well
03:42as other common tools.
03:44The Quick Access Toolbar contains commonly used tools that can be customized to include the tools you use most often.
03:53The Ribbon is a palette that displays task-based tools and controls, organized into tabs such as Home, Viewpoint, Review,
04:02and more.
04:05The Properties palette is a dockable window that can be docked on the left or right sides, or at the
04:11bottom of the interface.
04:13Here you can find information about the selected item in the scene view.
04:18The selection tree displays the entire structure of the imported model, showing each file, object, and layer within it.
04:28Expand or collapse items to explore the model hierarchy.
04:33This is especially useful for selecting specific parts of the model quickly.
04:39Click an element in the tree to automatically select it in the scene view, and vice versa.
04:46The navigation bar provides 3D view tools that help you move around the model, such as Pan, Zoom, Orbit, and
04:55Walk.
04:57In the top right corner of the scene view is the view cube, which allows you to see where you
05:02are in the model.
05:05You can quickly change the view of the model by clicking on the view cube.
05:10The scene view is the main center area of the interface, and contains the actual model that you are reviewing.
05:18At the bottom of the scene view is the status bar, which includes sheet, browser, and file performance information.
05:28Looking more closely at the ribbon, notice that it is divided into different tabs, with each tab supporting a specific
05:35activity.
05:38Within each tab, tools are grouped together into task-based panels.
05:44On the home tab, these include project, select and search, visibility, display, and tools.
05:56When you click one of the tools in the tools panel, another movable palette opens.
06:03Click and drag the palette to dock it, using any of the on-screen arrows.
06:09If you click another tool and then dock it using the same arrow, you end up with multiple palettes on
06:15top of each other.
06:17In this case, tabs appear at the bottom to switch between them.
06:23When you select an item in the scene view, it appears selected in the selection tree, as well as in
06:30the properties palette.
06:33As a final tip, if you have a wheel mouse, you can use the middle mouse button to zoom, pan,
06:40and orbit.
06:43Scroll the mouse wheel to zoom in or out, and press down on the wheel to pan around.
06:48These settings can help to ensure smoother navigation, better visualization, and optimal performance for your projects.
06:57Start by clicking the application button, and selecting options to open the options editor.
07:03These global settings are persistent across all Navisworks sessions.
07:08Expand the desired node, and click the option that you want to configure.
07:14For example, expand the interface node, and select the display units settings to customize the units used by Navisworks.
07:24Keep in mind that changing the settings here does not change the distance of items.
07:30Navisworks is a unitless software, so this simply changes what you see when you measure things.
07:37The sectioning page lets you control the display of section caps.
07:43Use the options on the selection page to configure the way geometric objects are selected and highlighted.
07:51On the measure page, you can adjust the appearance and style of measure lines.
07:57Use the snapping page settings to adjust cursor snapping.
08:02Scroll down to and expand the file readers node, where you can configure the file readers required to open native
08:09CAD and scanning application file formats in Navisworks.
08:13For example, on the 3DS page, there are settings to convert hidden information and search for bitmap files.
08:23On the DWF page, you can change the faceting factors in 3D models.
08:30On the IFC page, you can change the conversion method used.
08:37Decide whether you want to convert spaces to hidden, show, or skip them, as well as many more options.
08:45Close the options editor.
08:48A powerful feature that can help you to stay organized in Navisworks is viewpoints.
08:55Viewpoints are saved views of specific locations in your model.
09:00In this example, the Ice Ring model is at the home view.
09:05From the Viewpoint tab.
09:08Save, Load and Playback panel.
09:11Expand the Save Viewpoint drop-down, where you can choose to save a viewpoint or record an animation.
09:19Saving multiple viewpoints in an animation allows you to walk through the model.
09:25For example, from the Current Viewpoint drop-down, select Entry.
09:32Then click Play to play the Entry Viewpoint animation.
09:37This was set up as a recording of where the mouse was looking.
09:42Use the player controls to pause or stop the recording.
09:47From the Current Viewpoint list, switch to another viewpoint, such as Ground, or Ice Rock Cafe.
09:58Because the Ice Rock Cafe viewpoint was built using the walk command, you can walk around in your model, choose
10:04a different direction for your view, and walk through to that location.
10:10Useful for managing the display of elements efficiently.
10:15If you want to remove specific parts of the model, you can hide the objects in the current selection, so
10:21that they are not drawn in the scene view.
10:24For example, when you walk down the corridor of a building, you may want to hide a wall that occludes
10:31your view of the next room.
10:34Select an item in the model.
10:37Then right-click the item and select Hide, or press Ctrl-H.
10:42You can now see whatever is behind the hidden item.
10:46To make the object visible again, from the Home tab, Visibility panel, click Unhide All.
10:56Alternatively, if you want to hide multiple items, such as all the elements that make up the roof, you can
11:02select the roof in the selection tree, and then click Hide in the Visibility panel.
11:09Another key visibility feature is the ability to create cross-sections of your model in a 3D workspace.
11:17A cross-section is a cutaway view of a 3D object that enables you to see inside the object.
11:24From the Viewpoint tab, Sectioning panel, click Enable Sectioning.
11:31On the Sectioning Tools tab, Mode panel, you can choose to create the cross-section using a plane or a
11:38box.
11:40In Planes Mode, drag the Move Gizmo up or down to position the plane and see different parts of the
11:46building within your model.
11:49In Box Mode, drag the Move Gizmo to change where the box cuts the model.
11:56You can adjust it in all directions, X, Y, and Z.
12:03...and data created by multidisciplinary teams, and enables you to explore and review complex models in real-time.
12:11While you could also use Revit to bring these models together, a big advantage of using Navisworks is the reduction
12:17in file size.
12:18A 30MB Revit model reduces down to just 4MB in Navisworks.
12:25By simplifying the model, visualization speeds up without losing details.
12:31Before you append the models together, consider the files that you can bring into Navisworks and what the result will
12:38be.
12:39There are many different CAD and BIM file formats that can be opened directly in Navisworks or appended together into
12:45single consolidated models.
12:47This includes everything from Autodesk software, Bentley, Esri, and others.
12:55In terms of the resulting file, Navisworks has three native file formats.
13:02NWD, NWF, and NWC.
13:06When you open a file in Navisworks, a snapshot of the original file is automatically created.
13:12This creates an NWC file, which is basically a Navisworks cache file.
13:19Think of it as a snapshot or link to the original file.
13:23You have two options for saving the time.
13:26To save a current snapshot of the project with all of the model geometry and markups included, save an NWD
13:33file.
13:34Again, that is just a snapshot of the current state.
13:39By saving the model as an NWF file, you include links to the original files that form a Navisworks model
13:45with its markups.
13:48Make sure that you are working in the NWF version so that you are always using the latest version of
13:53the model.
13:54To start a new project, on the Navisworks homepage, click New.
14:02Then, from the project panel, click Append.
14:07In the Append dialog, select the files that you want to combine.
14:11For this example, several different Revit project files are selected, including the architectural, electrical, facades, HVAC, plumbing, site, and structure
14:25models for the same building.
14:27Click Open.
14:29A loading dialog appears, and then all of the selected models open.
14:34To save the file, from the application menu, select Save As.
14:41In the Save As Type drop-down list, select the NWF file type for the latest version of the software,
14:47which is Navisworks 2016-2025 file set.
14:51When checking design dimensions or verifying clearances in a Navisworks model, accurate measurements are crucial.
15:00Using grids and levels can make this process much easier.
15:04Especially when working with complex 3D models.
15:08Grids and levels can help you to explore a scene and give context to your location, as well as the
15:14location of objects within a scene.
15:17To measure using the grids and levels, from the View tab of the ribbon, Grids and Levels panel, click Show
15:24Grid.
15:27This overlays grid lines and level indicators in your 3D view, helping you to identify the exact location of different
15:34elements within the model.
15:37From the Active Grid list, you can select which grid system to display from the different files appended to the
15:45model.
15:47If a grid is not included in one of the files, the Show Grid tool is unavailable.
15:54Grid modes control the display of the grids, in relation to the current camera position.
16:00You have several options for adjusting the display of grids and levels in the scene view.
16:06Above and below, displays the active grid on the levels directly above and directly below the camera position in red
16:13and green respectively.
16:16Above, displays the active grid on the level directly above the camera position.
16:29All displays the active grid on all available levels, including green and red grids, as well as halftone images of
16:37all the other grid locations.
16:40Fixed displays the active grid on a single level, specified in the display level dropdown.
16:48It does not change the location of the grid as you orbit around the model.
16:54When you combine models, the grid is turned on automatically.
17:00By selecting the active grid, you can communicate where you are in the model more effectively.
17:07With a grid displayed, you can more easily identify locations to snap to or measure.
17:15To turn grids and levels off.
17:17Or design changes.
17:20These markups are saved with viewpoints, making it easy to share your comments with other team members during reviews.
17:29This enables everyone to see the highlighted issues and proposed solutions, streamlining collaboration and issue resolution.
17:37In addition to text and shapes, you can also add tags, which combine the features of markups, viewpoints, and comments
17:47into a single easy to use review tool.
17:49For example, a tag places a marker, rather than text, in the same view.
17:56Once the tag is placed, you can review the comments in the order in which they were added.
18:02Tags enable you to see who added or edited a tag, and also to search for comments.
18:09In this example, a measurement has already been added.
18:14To add some context to this measurement, from the review tab, markup panel, click text.
18:23In the same view, click the location where you want to place the text.
18:29Enter your markup text, and then click OK.
18:34The markup is added to the selected viewpoint.
18:38Note that if you change the viewpoint, you will only see the markups in that view.
18:44You can also use the drawing tools to further emphasize your markup.
18:50From the draw dropdown, select a drawing style, such as cloud.
18:56And then click in the viewpoint to begin drawing the arcs of the cloud.
19:01Each time you click, a new point is added.
19:06To terminate the cloud, right click in the scene view.
19:11The tags panel enables you to add and manage tags.
19:16Click add tag, and then, in the scene view, click the point or object that you want to tag.
19:25In the add comments dialog, enter the text to associate with the tag,
19:30and set the status of the comment to new, active, approved, or resolved.
19:38In this case, select new.
19:42When you click OK.
19:44Discipline interferences, or clashes, earlier in the design process.
19:49This eliminates the manual process of inspecting and identifying clashes in a 3D project model.
19:56Early clash detection helps to keep the construction costs down by reducing the number of change orders caused by objects
20:03occupying the same space.
20:05In addition to checking stationary objects in the building, you can check mobile objects, such as cranes, to ensure that
20:13construction equipment does not collide with anything on the project site.
20:17Here is a high-level workflow for the clash detective.
20:21Start by setting the ignore clash rules.
20:24This will help to minimize false clashes between items on the same layer, within the same block group or cell,
20:31or items with the same snap points.
20:34Understanding these ignore rules can make your results more meaningful.
20:39Once you set the rules for your test, select the required items to be included in the test.
20:46The items selected under selection A are compared against the items selected under selection B, such as structural framing versus
20:54plumbing.
20:56Next, use the clash settings to set the type of clash test to be run.
21:00A hard clash highlights objects that reside in the same space, or intersect each other, while a hard, conservative clash
21:08returns objects that might clash.
21:12With a conservative test, you can get more false positives, although it is much more thorough.
21:18A clearance clash test enables you to set a minimum distance between objects, such as a water line and a
21:25sewer line that must be a certain distance away from each other for sanitary reasons.
21:30Use the tolerance field to set the minimum distance for the clearance test.
21:35A duplicates test returns objects of the same type that reside in the same space, making it easier to delete
21:42any duplicate items.
21:44To run a clash test, from the Home tab, Tools panel, click Clash Detective.
21:52The clash detective can be docked, or floated, as needed.
21:58Click Add Test to add a new test.
22:01Then double-click the test and give it a meaningful name, such as plumbing versus structure.
22:08Next, on the Rules tab, you can indicate which rules to use.
22:15Remember that you can have the test ignore items on the same layer, in the same group lock or cell,
22:21or in the same file, as well as items with coincident snap points.
22:28For this example, select all four ignore rules.
22:33Switch to the Select tab.
22:36Here you select the items you want to compare against each other.
22:40For example, in selection A, select your structural file, and in selection B, select your plumbing file.
22:50Scroll down to the Settings group.
22:53And for this example, set the type to Hard.
22:58Click Run Test to run your selected clash test.
23:03The Results tab automatically displays to allow you to interactively review the found clashes.
23:11Scroll up to see a summary of how many clashes were found between the plumbing and structural members of the
23:17building.
23:19In the Results area, clashes are displayed in a multi-column table to enable you to locate clashes more easily.
23:28Expand the display settings to enable efficient reviewing of clashes.
23:34For example, you can change the colors displayed for item 1 and item 2.
23:39If you have a cluttered model, you can use the isolation options to dim or hide items that are not
23:46involved in the selected clash.
23:49To review a clash in the model, select it in the Results list.
23:55Here, select Clash 5.
23:58Then, move the Clash Detective window aside to view the model.
24:04You can see that the pipe extends through the floor.
24:08In this case, on a Clash Test in the Clash Detective, you can review all found clashes on the Results
24:13tab in a multi-column table.
24:17When you select a clash on the Results tab, the scene view automatically zooms to that clash in the scene.
24:24With a clash selected in the table, you can pan, zoom, or orbit the scene view.
24:31Expand the Display Settings panel on the side of the Results tab.
24:36From here, you can set how the clashing items display in the scene view.
24:42Each item in the clash can be set to its own color.
24:45And you can fade or completely hide everything else in the scene view.
24:50Use these settings to isolate clashed items for a clearer picture of the corrections that need to be made.
24:57As you select different clashes, the scene view zooms to that spot.
25:03Switch the isolation option from Dim Other to Hide Other to see the difference.
25:10For a good view of a particular clash, zoom in tight.
25:16If the viewpoint is set to auto-update, the viewpoint is saved automatically.
25:22Alternatively, you can right-click in the Viewpoints column of a specific clash result and select Save Viewpoint.
25:30In either case, the position displayed in the scene view is saved as the viewpoint for the clash.
25:36And a viewpoint camera thumbnail appears in the results grid.
25:40Clashes are most often found between different disciplines, such as structural features versus plumbing, or HVAC that are designed by
25:49separate trades or companies.
25:51In the Clash Detective, you can assign responsibility for each clash to the correct person or trade for resolution.
25:59And add comments as needed.
26:02Assigning a responsible party for making or coordinating changes ensures that clashes are seen and acted upon before they become
26:10a problem during construction.
26:13Adding notes allows you to indicate the type of action to take.
26:17When you assign a clash, you can also set a status to help keep track of any decisions.
26:24In this clash example, a pipe extends through a floor.
26:29You do not know if the floor is structurally stable enough, with the pipe being so close to the wall.
26:35On the Clash Detective Results tab, make sure the clash is selected.
26:41And then click Assign.
26:43In this case, in the Assign To field, add the Structural Engineer.
26:50In the Notes box, add an explanation of what you are asking them to do for this clash.
26:56Then click OK.
26:59Next to the clash in the Results grid, there is now an entry in the Notes column.
27:06You can use the Status drop-down to track the lifecycle of the status.
27:11For example, once you assign the clash, you can set the status to Active.
27:17After the engineer has looked at it, they can change it to Reviewed and add their own comments by clicking
27:23Add Comment.
27:26Then, they can set the status to Approved.
27:29And click OK.
27:32Now, the clash has two comments.
27:35And it also has a saved view, so that others can look at it.

Recommended