Skip to playerSkip to main content
How to Create Tasks for 4D Simulation in Navisworks 2026 | TimeLiner Tutorial in Urdu
In this video, you will learn how to create tasks for 4D simulation in Navisworks 2026 step by step. We will cover all 3 methods: Manual Task Creation, Auto-Add Tasks from Selection Sets, and Linking Tasks from Primavera P6 / MS Project / Excel. This tutorial is perfect for BIM Coordinators, Planners, and Civil Engineers working on projects in KSA, Pakistan, and the Middle East.
In This Video You Will Learn:
How to add manual tasks in TimeLiner
Auto-Add Tasks using Selection Sets and Levels
How to link Primavera P6 and MS Project schedule to Navisworks 2026
How to use Auto-Attach Rules to attach model elements to tasks automatically
Task Types Explained: Construct, Demolish, Temporary
Best practice for task naming and sequencing for mega projects
How to run and export your first 4D simulation
Software Used: Autodesk Navisworks 2026, Revit 2026, Primavera P6 / MS Project
Create tasks in Navisworks 2026, TimeLiner tasks tutorial, 4D BIM Navisworks, Navisworks 2026 TimeLiner, how to create 4D simulation, Navisworks task creation Urdu, BIM 4D tutorial, Primavera P6 to Navisworks, MS Project to Navisworks, Auto-Add Tasks Navisworks, Auto-Attach Rules Navisworks, BIM Nexus Academy, 4D BIM workflow, construction simulation Navisworks, Revit to Navisworks 4DHashtags:
#Navisworks2026 #TimeLiner #4DBIM #BIMUrdu #BIMNexusAcademy #NavisworksTutorial #BIMCoordination #ConstructionSimulation #PrimaveraP6 #AutodeskNavisworks

Category

📚
Learning
Transcript
00:10In the name of God, the Most Gracious, the Most Merciful. Peace, mercy and blessings of God be upon you.
00:15May God bless you and protect you from the village of God.
00:20God Almighty is good and I love you so much.
00:24How to use it and how to use it to use it
00:30This is not a requirement for any access to your device.
00:34This means that the phone's screen is on the computer or on the computer.
00:39This is a problem and a task is required for this purpose.
00:43I have a meal or dinner that comes with a mask.
00:48It's too late, it's dead, it's dead, it's too hot, it's too hot, it's too late
00:52This keyboard is the height of the keyboard.
00:57This card is necessary for us and it is necessary for us to use it.
01:01You have three ways to do it.
01:04How to use it in the same way
01:09If you keep silent, you won't be able to stand still, because everything will come to you.
01:13What's wrong with you?
01:17Everything you need to know when you sleep when you're asleep
01:22پکے
01:26How to use it as a way to eat and drink it
01:31And we are talking about our situation, and we are talking about it.
01:38We are talking about our world, meaning we are talking about it.
01:42He kept silent, and he was silent, and he did not ask for anything else.
01:47This is the best way to go
01:52This is the best choice for you. This means that you are silent.
01:57Shut down and close the text on your keyboard.
02:01If you keep silent, remove the color or transmission of the printer.
02:05And so on, it's okay to shut up and hold on to it.
02:09Get the most convenient prices for this app
02:12use this when you have 10-50
02:18There is no need to use it, so there is no need to use it.
02:22from model fast method fast method here method 2
02:28This is the most basic model in the world.
02:31Automatically keep silent, this is the most used method in KSA
02:35projects
02:39I want everything to come to you set for every
02:44Topmost layer or for every item, meaning topmost layer is the name of each item.
02:49The element is used as a keyboard shortcut.
02:53navi source will create one task per revit level ٹیک ہے Urs Subtract
02:57navi source Go to task Go to create Create button
03:01As a request for more information, then you just edit the date or date.
03:05کیا کRNA
03:11Create task
03:14is the heart of photos until you have three ways to do this
03:18example if
03:22you have revit model with levels
03:26level one sat level one level two level three
03:29navi source create three tasks automatically attach all object from that level ٹیک ہے
03:34To ask the source navi source to create a task create this page
03:37level one level two level three time saving tip
03:42time saving tip keep silent use selection sets selection
03:47Set the key to using auto selection. Use the silent key.
03:51Create sets like zone a zone b foundation then auto add by sets
03:57Or use sets to create new ones that add data to the user.
04:01link from schedule professional method method 3 Apps after that professional
04:06method How to use the keyboard link from schedule
04:10Schedule through the links to go and add more silence to the site.
04:14ٹیں import schedule and import schedule time liner data source
04:19step ٹیک ہے add کر لیں کی بھی Fael AAپ کے پاس ہے and ہ آپ select
04:25Step mode to configure mapping
04:31tab map task name start date start date end date end date
04:36Type of task
04:40Pass Go ہے and ہ ہے ٹیک ہے and کر لیں کے after the go ہے link from schedule
04:46professional method method 3 Step 3
04:50c Joe Huta auto attach task to model task tab columns attach ٹیک ہے ہہ to
04:56Subtract the text automatically in the attached column and keep it silent right click
05:00Auto attach using rules rule sample for example rule of property
05:05element Add to the list Property level Add to the list
05:09He kept silent about the set of his words and the words that came with him in the same way.
05:13The names of the people are worn out, and they remain silent.
05:17attach hundred sets of elements in two seconds ٹیک ہے to subtract
05:21My skin is worn out and the element is attached to it.
05:25step d rebuild the task right click rebuild task
05:30this create wbs same as you primary schedule or s کے after js subtraction
05:35What is the schedule? What is the best way to propose?
05:38wbs create
05:43You must fill for every task.
05:48The next task is to fill the wall with the task of using the column to build it.
05:52name اپ نے
05:56اپ نے name لکھتے ہیں example اپ کے پس column ہے ٹھیک ہے
06:03Derivatives
06:06ہی کیہ ہے and
06:09Mark card task type most important for 4D construction
06:12as solid when build use 90% of time demolished ٹھیک ہے اگر construct
06:1790% of the time.
06:20demolished transparent for removal
06:23different color red
06:27temporary yellow transparent yellow color
06:31This is what folding the system and the framework are installed in it.
06:33How to create
06:36a perfect 4D task sequence 4D task
06:41The sequence we created created a perfect card.
06:44The number of the structure is the foundation and the structure.
06:47The envelope is the MVP and the finishes are the best.
06:51level by levels ٹھیک ہے level by level silent l1 foundation
06:55add by columns l1 slab then l2
07:01if big building split by zone a b c dates no gap if task 1 ends 15
07:07start to start zero six August The task must be completed
07:11This is what you need to do.
07:15For the task before simulation, this is the first step.
07:18simulation start the task
07:20The most important thing is the simulation tap setting.
07:24The first step is coming first week check short date
07:28and time simulation ٹھیک ہے Similar objects
07:33appear in the text below to see the text of the object
07:36Correct S
07:39Attachment is correct.
07:42This is the most important thing in the world.
07:45In fact, everything is correct, and it is completely correct.
07:48What is the best way to do this task?
07:51create What you have come to
07:58task to select the next time
08:02When the phone is active, the name is on it.
08:05status Planned date Planned date Planned date
08:09The end date is the start date and the start date is on the same date.
08:13end and date The actual atmosphere
08:17ہے and
08:21Here's what you need to do with your existing selection.
08:25What is the current one?
08:34How to use it for rent
08:38ہے
08:42یہاں پہ find the next one
08:47find the best way to find the best way to do so
08:51These positions are used to hold your tongue.
08:54Use the task to add silence to the task.
08:58Create an increased task.
09:02He came to me, and he came to me.
09:06This is what happens to me, so what is the matter with me?
09:11Tab ھہ
09:15explain what is the topic ہے
09:20absolute instruction tutorial
09:25What is the meaning of this question? What is the meaning of the question? Understand what is coming.
09:28یہں پہ to add task
09:32Insert the text and set the auto add task.
09:36Auto add task
09:40attach Model Size Sorting the keyboard to the next page attach the keyboard button
09:44یہاں پہ attach the card ہیں ٹھیک ہے to attach ہیں ٹھیک ہے silent
09:48Subtract the password from the auto attach using the rules for the next step.
09:52clear attachment
09:58I am clear that I am silent, I move up and down, and I come to you.
10:05Entries to increase the test. How to perform the task to perform the task.
10:09If the move and other things are silent, stay silent after comments.
10:12And others add a word to the columns
10:16Show
10:20planned dates show actual date dates planned
10:24and an actual date
10:29Go tab
10:34I'm sorry, I'm sorry, I've been silent
10:38How many cards do you need to exercise?
10:43The task of subtracting and adding a card to the task
10:46No task Subtracting Subtracting Add
10:49The structure is not necessary.
10:52The model for this task test is silent.
10:56MVP is the first step in the architecture.
10:59The discipline of this atmosphere is 4D simulation, starting to shut down.
11:03To fix this problem, it is not fixed.
11:06He was silent, he was silent, he was silent, he was silent, he was silent, he was silent.
11:11My son, this is a curse, like the imagination of our corner ہے Jessie
11:16Use the task to select the next task.
11:18Select the next page right click
11:21What's wrong with this right click?
11:24attach current selection
11:27Current selection to add to the silent element
11:30different model
11:34This task is the rarest thing to do when you are silent.
11:38This exercise is basically a physical sensation.
11:42The task of this task is to add something else to it.
11:45Instruction to add something to it and then it will happen, God willing.
11:48The most important exercise is what you need to do with it tips
11:51This cover is coming, God willing.
11:55May God’s peace and mercy be upon you.
11:59When I meet you or see me, I brought you this video.
12:01There is a lot of benefit in this video.
12:57Music
Comments
Muhammad Ehsan ul Haque Ehsan
Creator
Navisworks 2026

Recommended