**TITLE**

How to Do Layout by Coordinates Using Leica Builder 405 Total Station | Step by Step

**DESCRIPTION**

Welcome to Daily Survey Gets!

In this practical land surveying tutorial, learn how to perform coordinate layout (setting out points) using the Leica Builder 405 Total Station.

This video explains how to use known coordinates to mark construction points accurately on the ground.

📌 **Topics Covered:**
- Setting up and leveling the Leica Builder 405
- Establishing coordinates over a known station
- Orienting the instrument using a known backsight point
- Entering Easting (E), Northing (N), and Height (H) coordinates
- Opening the APPL → Layout program
- Selecting and entering the layout point
- Turning the instrument toward the required direction
- Measuring the prism and guiding it toward the design point
- Understanding layout differences and marking the final point

🎯 **What You Will Learn:**

By the end of this tutorial, you will understand the basic procedure for setting out construction points using coordinates with the Leica Builder 405 Total Station. This method is useful for building layouts, column positions, roads, foundations, and other construction surveying work.

⚠️ **Important:** Make sure the station coordinates, backsight orientation, instrument height, prism settings, and project coordinate system are correct before starting the layout.

Follow **Daily Survey Gets** for more practical tutorials on Leica, Sokkia, Topcon, GPS surveying, AutoCAD, leveling, and construction setting out.

**HASHTAGS**

#LeicaBuilder405 #CoordinateLayout #TotalStation #SettingOut #LandSurveying #ConstructionSurveying #SurveyingTutorial #DailySurveyGets

**TAGS / KEYWORDS**

Leica Builder 405, Leica Builder 405 tutorial, layout by coordinates, coordinate layout total station, coordinate setting out, Leica total station layout, Easting Northing Height, total station setting out, construction layout, column layout, foundation setting out, backsight setup, station setup, land surveying tutorial, civil engineering, surveyor training, Daily Survey Gets

**CATEGORY**

Education

Category

🤖
Tech
Transcript
00:00So today we have to tell you once again how to apply Codinate, how to apply Codinate like Abender 405
00:11The layout is put up, it is okay, it has to come in the program, there are three options in the program, there is an option, there is a mayor.
00:18and besides that
00:23That this setup should be done in a fixed manner, this program should be done in this way, why should I proceed further?
00:34In this Kradavar.
00:47that youb that akraton
00:50By doing this, point unready comes in it, okay
01:06Ismet changes points rapidly
01:22By changing the point from the cursor, whatever points are with you, they will come here.
01:29So, I want to put a point on this side, so look at this turn boulder on this side.
01:39Anne's Totter Station
01:41Which has been lost below, then the angle of the tin tile is telling a distance that is so many meters behind
01:50Towards or forward or backward and its number is English
01:55There is English teak on the Harijan river and the Jaina below it is
02:03Now we have first directed Haristhan English John, this is Zero Zero.
02:08And going towards night with both hands
02:15First of all, it is called zero zero.
02:39Make it zero, okay, right now I have set the lower prism and got a short, now I have got three milliseconds.
02:49There is only one, but if you still want to remove this feature then it should be made absolutely zero.
03:00Coming now
03:10So, you can change as many coordinates as you want by using the cursor.
03:17Ajay should do Jhalaana
03:19Jadan Kareng Do Thazan
03:19should be sieved
03:19Rooting
03:19inlay
03:19inlay
03:20should be sieved
03:20inferior inlay

Recommended