Skip to playerSkip to main content
Unlocking the Power of BIM: A Comprehensive Guide to the BIM Process

Welcome to our YouTube channel! In this video, we'll explore the BIM process, a revolutionary approach to building design, construction, and management.

What is BIM?

Building Information Modeling (BIM) is a digital process that enables the creation and management of a building's information throughout its entire lifecycle. It's a collaborative approach that brings together architects, engineers, contractors, and owners to work together on a single, shared model.

The BIM Process

The BIM process involves several stages, including:

1. Concept and Design
2. Detailed Design and Virtual Construction
3. Construction
4. Operations and Maintenance
5. Demolition and Renovation

Key Pillars of BIM

1. The "I" in BIM is Information
2. Shared Digital Resource
3. Collaboration from Day One

Learning BIM

To learn BIM, follow these steps:

1. Foundational Knowledge
2. Software Skills
3. Structured Learning Path
4. Certification
5. Practice

Keywords:

- BIM Process
- Building Information Modeling
- Collaborative Design
- Data-Driven Construction
- Digital Twin
- AEC Industry

Hashtags:

#BIM #BuildingInformationModeling #AECIndustry #ConstructionTechnology #DigitalTransformation #CollaborationIsKey #BIMProcess #BuildingDesign #ConstructionManagement #ArchitectureEngineeringConstruction

Video Script:

[Intro music plays]

Narrator: "Welcome to our YouTube channel! In this video, we'll explore the BIM process, a revolutionary approach to building design, construction, and management."

[Visuals of BIM process and models]

Narrator: "BIM is a digital process that enables the creation and management of a building's information throughout its entire lifecycle."

[Visuals of BIM stages and pillars]

Narrator: "The BIM process involves several stages, including concept and design, detailed design and virtual construction, construction, operations and maintenance, and demolition and renovation."

[Visuals of learning BIM and software]

Narrator: "To learn BIM, follow these steps: foundational knowledge, software skills, structured learning path, certification, and practice."

[Outro music plays]

Narrator: "Thanks for watching! Subscribe to our channel for more BIM tutorials and industry insights."

Video Length: 10-15 minutes

Target Audience: Architects, engineers, contractors, and owners in the AEC industry

Category

🤖
Tech
Transcript
02:36from conception to demolition and reuse.
02:49We can think of it as the digital evolution from drawing board
03:05to CAD. Just imagine that when you see people at the desk or boards,
03:18the boards working on boards and then the boards are transferred to CAD
03:24to this process.
03:30process ki taraf hai. Isi tarah hem CAD process ki taraf joh hai usse hem ab BIM ki
03:36taraf joh hai woh shift ho rhei hai. Joh basically collaborated or data centric
03:42methodology hai. Yarni collaborative mahtarabhota hai ki aap data share
03:47kar rhei hai sab ke saath. Or centri aapne joh hai data kahi bhe store kiya hoa
03:53taakhe sare joh hai usko jitne bhi stake ho jahe hain ko access kar sake. Key pillars
03:59of the BIM process. Acha number one, the eye in BIM is information, okay? Eye joh BIM
04:06ke anzar hata hai, woh bada important hota hai kiwunki woh information ke rhi stand
04:10kertai hai. Toh aap agar khaehen ke humare paas 3D model hai, lakin uske uske anzar
04:17information nahi hai, toh hum yeh kehe sakti hai, ke woh ek joh hai BIM model nahi hai hai,
04:22okay? Toh BIM model ke rhiya bhout sari chisdhoun ki zhururut hai, jis mein information bhi
04:27honni chahi hai, jis mein 3D bhi honni chahi hai, aur jis mein 2D bhi honni chahi hai.
04:31Information seh matala wotah database. It's 3D geometry just the visual container,
04:36joh 3D geometry apoi hoti hai, wotah sari aapko dhekhen ke rhiye ke dhekhen
04:41wali chizh oti hai, jis se aap dhek eek idea laga lieti hai, yeh kya chizh hai. The rare powers
04:46lies in the data, lakin aصل power ki hootii hai, aصل joh uska mugs hoota hai, usse
04:51hem kya sakti hai, ki woh data ke anndar hoota hai, attached to every component, joh
04:56ke data, her component, jitnye bhi component, uske anndar is small or are, sab ke
05:00saath A attached hoota hai. For example, A wall, agar abdiwar hai, in BIM isn't just line,
05:06yeh ko lines nhi hootii, okay? BIM ke anndar mein yeh kya sakti hoon ki BIM
05:11aapke object ke uper kam kar raha hootai hai, okay? Object wise softwares hootii
05:16hai, okay? Mocer uske tools hootii hai, leakin joh CAD hoota hai, wo entity wise hootai
05:22hai, okay? Entity ke objects hootii hai, okay? Entity wale object hootii hai, jahe circle
05:27hoogia, line hoogia, arc hooghi, leakin BIM ke anndar agar ek table hai, to complete
05:32table hai, agar wall hai, to complete wall hai, agar roof hai, to complete roof hai,
05:37okay? It is an object with properties like material. Uske anndar, yani, agar wall hai
05:44aapke paas, to uske anndar agar abdeekhen ghi ki, uske anndar agar aapke paas uska material
05:49bhi, woh batae gha, BIM ke anndar ki material kya hai, concrete hai, gypsum hai, insulation
05:54kya kya hai, performance, u value, thermal value si car kya hai, r value, insulation value si
06:01kya hai, fire rating kya hai, cost, manufacturer joh ask ki cost kya hai, uska
06:06manufacturer joh se binaya kya hai, cost supplier kya hai, supplier uska kya hai,
06:11schedule, installation time, sequencing, schedule uske sare, installation time,
06:19kikri dheri bhe install ho, joh banei ghi, okay? Sequencing, maintenance, life
06:25smam, replacement and schedules, okay? So, yeh sari chizhe, jab tuk yeh sari chizhe kisi bhi
06:32element ke anndar naihi aati, toh, uswakit haem woe kya sakti hai, ke woh eek bim
06:38model ka component naihi hai, thik hai? Dousse nombor phe hai, shared digital resources,
06:44thik hai? Jarni, aapke paas joh bhi element hai, joh bhi model hai, woh eek shared digital
06:51resource hota hai, the common data, the common data environment, this is the heart of
06:58beam collaboration, or yeh hi joh hai, uska dil hota, uska mugs hota hai, thik hai, beam
07:03ka, thik hai, jiske anndar aapke paas koi bhi data, aaphi, koi bhi model, aapne, kisi bhi
07:08central location keo pere usko share kati hai, thik hai? Yarni, aapka, aapka aapka server
07:13hai, thik hai, aapne server keo pere model rakhha hua hai, thik hai, aapke jitne bhi
07:18stakeholders nai, saare usko access kare rhe hai, saare uske data uska na, woh share
07:23kare rhe hai, online repository, where all project information is collected, or joh
07:28hai, online her benda, joh ki information hai, woh collect kare sakta hai, ya, uske
07:33information joh hai, woh insert kare rhe hai, managed and shared. Managed bhi
07:38kare sakti hai, or shared bhi kare sakti hai. This single source of truth, insured
07:43everyone architect, he can, architect engineer contactor or no it's working
07:49from the latest. Or is tarah kya hote hai? Jitne bhi hemare architects hote
07:53hai, engineers hote hai, contactors hote hai, owners hote hai. Thik hai, thoi
07:58woh latest joh hapka model rha, uske sath aapne aapko, joh hai, munsilik rakti
08:05hai, aur uska data johan woh share kare rhe hote hai. Thik hai? Approve data
08:11reducing error and misinterpretation. Thik hai? To is tarah se kya hote hai
08:18kya hote hai, aapka joh data hote hai, woh saare ek dousay ka share kare
08:22hote hai, aur latest data bilkul share kare hote hai, light data bilkul share kare
08:26kare hote hai, reducing error, taakke errors kam ho, misinterpretation joh hai, woh
08:32kams kam ho. Thik hai? Us tisai number hai collaboration from day one. Thik hai, day one
08:37say na, aap pehle tinsay hi joh hai, uski sari chidha data, model, 3D, 2D,
08:442D, haar chiz share kare se, joh hai share kare hote hai, aur har ek ke pats uski
08:48access hote hai. Unlike traditional method, where discipline work in silos being
08:54require early and continuous collaboration. Thik hai? Agar aap dousra process joh
08:59apara traditional method, jis se aam CAD process kaya sakti hai, usko agar dekha hai,
09:04to uske dher ye sari chidhae apke paas possible naihi thi, ye uske dher ye sari chidhae
09:08naihi ho sakti thi. Lekkan BIM joh hai, BIM early stages se ye sari chidhae apko
09:13dhe raha hote hai, continuous collaboration, aur continuously apke paas collaboration
09:17hote hai. All stakeholders are involved from the beginner. Jitne bhi stakeholders
09:22hote hai, sari johan ko involve kar leti hai, beginning say to define goals,
09:26thik hai, process and how they will work together. Jaini aap goal bhi inke sath joh
09:32hai define kar leti hai, process bhi sari define kar leti hai, aur kis saa se kam kia
09:37jaya hai, sara, sari milke kis saa se kam kare hai, woh bhi define kar raha hai. This is
09:41often formalized in document like the BIM execution plan, aur jhe eek aise document
09:48ki oopper sari chidhae teharreeer kar lyi jati hai, aur jikhi jati hai, jese aap BIM
09:52execution plan, plan kaati hai, B-E-P bhi usai kaati hai, uska short abrivation hota hai B-E-P,
09:59BIM execution plan. Uske baat aagya chanai toh BIM process in action joh hai, agar BIM process
10:05ka action dikhen, the stages of a project. The following chart illustrate how the BIM process evolves
10:12to the different stages of project from initial concept to long term facility management.
10:18Okay? So, hum agar isko dhekhen toh kuch ishra se aapka BIM management ka joh aapka plan
10:24hoota hai, woh ishra se naza hata hai, thikhi hai. Jis meh aapke paas architecture,
10:28joh models hootay hai, thikhi hai, structure model hootay hai, phir M-E-P model hootay hai,
10:33phir uske nzaar application bhi nikal lieti hai, construction, time or cost kitna 4D
10:40or 5D kitna hooga, woh ap laga sakti hai. 4D apka time hootay hai, 5D apka cost hootay hai,
10:45thikhi hai, thikhi hai, cost bhi nikal sakti hai, time bhi nikal sakti hai, thikhi hai,
10:49cost estimation jasai yeh, 5D cost, joh hai, integration, woh ap kar sakti hai,
10:54uske baad use model for precise guidance, aur guidance ke lihi aap model ko ishmal
10:59kar sakti hai, record as build condition via scan or as build condition bhi aap joh hai,
11:05uske baad data rich model, apke paas joh aapka data rich model ta hai, usko ap
11:16ishmal kar sakti hai, maintenance ke lihi hai, thikhi hai, usko banane ke lihi hai, digital twin
11:21for performance analysis of digital team ko ap ishmal kar sakti hai, performance analysis
11:26ke lihi hai, thikhi hai, aur uske baad demolition haapne kar ni hai, material you use usko bhi
11:31haap smart kar sakti hai, thikhi hai, uske baad aghe chalhe hai, thabhira hum
11:37ága, stage one mein mein kya kar rhe hoitai hai, thikhi hai, kyunke meinne isko stage wise
11:41joh hai, sara distribute kiya hoa hai, sara joh isko binaya taakke آپko semjha
11:46jahe, thikhi hai, thikhi hai, thobse pehle hum concept and design ki tarp badhti
11:50hai, what happens, architecture, engineer and stakeholder use being to create initial massing
11:57models and run early stages analysis, thikhi hai, this mein aap ka
12:01solar jahe, solar jahe, solar jahe kab nikala hai, kab group ho raha hai, thikhi hai,
12:05wind kitshani hai hai, thikhi hai, hawa kahan se chal lihi, kis raf chal lihi, energy performance,
12:10sarae chihdi hai, uska concept and designer binaati hai, collaboration, thikhi hai, the team
12:15agrees on project, objective optional call, employee information requirement, thikhi hai,
12:21phir a, we, a, employee information requirement document hokta hai, isne yeh sarae
12:25chihdi hai, we, dhi ho two hi, thikhi hai, thikhi hai, app na joe client hokta hai,
12:29and create the BIM Execution Plan, which we use the BIM Execution Plan, which we use the BIM Execution Plan.
12:43Key Output, a coordinated 3D model with basic information.
12:50Key Output, a conceptual design. Use for Visualization and Feasibility Studies.
12:59So, if you look at it, visualize it and feasibility studies, you can use it.
13:07Stage 2, Detail Design and Virtual Construction.
13:13What happens? Discipline Specific Models.
13:16Architecture, Structured, MEP, Mechanical, Electrical, Pumping are developed and detailed.
13:22Stage 2, You can model architectureally.
13:27Structured, MEP, Mechanical, and Dinerage.
13:31So, I'm going to try to make a very long class.
13:37I'm going to try to tell you a few stages of this video.
13:42And then, I'll try to tell you a few stages of this video.
13:45So, if I have a very long video created this video and you'll be bored and you'll be bored
13:51and you'll be bored and start to understand.
13:55So, my goal is not that you will be bored.
13:58So, I do not want to die.
13:59I mean that you will need to be bored.
14:01And that you will be worried.
14:03So, after you have more interested and more 문cipes,
14:06What happened, now we are talking about stage 2, detailed design and virtual construction.
14:11What happened, discipline specific model, architecture, structure, MEP, mechanical, electrical plumbing are developed in detail.
14:18This is where the power of beam shines.
14:20Now, what happens is that the discipline of engineers, structure, MEP, architecture, mechanical, electrical plumbing are developed in a model center.
14:38This is where the power of beam is developed.
14:48I would say that the ability of beam is developed in a model.
14:55The ability of different stakeholders can be used in the same time.
14:59From that, the collection of software is automatically detected interfaces.
15:04So, if you have a column or a wall or a machine or a machine or a machine, then you can automatically check the software.
15:19okay a pipe running through a beam for instance
15:21can you go pipe johai wo kishi beam ke
15:23andare tuh nah raha before reaching the construction site saving huge cost and time
15:28or isstahe seh ah jub tak aap construction shudder
15:31karen aapka bhoh zahda time or cost johai bichal
15:34liya jatahe kyunke aap basically virtual model
15:37eek bina raha hote hai and virtual work ka mqsad
15:39yeh hota hai construction seh pahle
15:41temam kisim ki chisim ko remove ke liya jai
15:44or process kiya jai
15:45ke zero free class model johai
15:48tiyar kiya jai jiske andare koi classes na ha
15:50simulation or analysis aap kar lete
15:53in the model data use for energy analysis aapne energy analysis
15:56karne hai to us ke riyan energy analysis ke riyan
15:58ap issthe ismal kar lete
15:59structure calculation ki ismal kar lete
16:02hai lighting studies and more
16:04us ke baad aapka time aajata hai cost aajata
16:083d models linked to the project schedule 4d to create construction
16:12sequencing animations and to cost data 5d for automated quality
16:18take off and cost estimation
16:20to phir aap time bhi nikala lete hai
16:22phir aap cost bhi nikala lete hai
16:24toh yeh ki mein kye sakta hou
16:26yeh makamal aapka na eek life cycle hota hai bim joh
16:30bim joh bim eek aasi concept aasa process
16:33hai joh apka life cycle hota hai kisim building
16:36ke liye aur makamal tawar peh
16:38peh aapka joh information joh hai mahiya kar raha hota hai
16:40har stage ke upor
16:42uske baad aapki stage 3 aajati hai
16:46jis mein construction aajati hai what happen
16:48the detail model use on site for guidance
16:51joh apka detail model hota hai
16:53woh site ke liye joh issue kar diya jata hai
16:55thik hai
16:56constructer use it for pre-fabrication
16:59woh fabrication ke liye
17:01cheeze unko joh hai tiyar karna
17:02shuru karthay taak
17:03constructer aur
17:04uske execute karne ki kooshis
17:06karthaya manufacturing building
17:07component off site with high precision
17:10reporting total station using the model to lay out
17:14points on the floor with the millimeter accuracy
17:17progress striking comparing the as build site progress with the plan model
17:23the as build model the model is continuously updated of that any changes made during the construction
17:28becoming the accurate record of the finished asset
17:31thik hai
17:31thoh saath saath execution kar raha hota hai saath saath fabrication ho rhi hoti hai
17:35thik hai
17:36or uske saath saath joh as build hota hai na
17:39usko bhi saath saath na tiyar kar liya jata hai
17:41jitnye bhi change ko record kar liya jata hai
17:43taak ke baad me joh hai as build bhi
17:45aap joh tiyar kar sengi
17:47kyunke
17:47ah mein ye
17:48mein ye toh kehsakta hong
17:50keh jub tuk aap care dismal kar rhae thai
17:52us wakit tuk toh
17:53bhoot zhah chanses thai
17:55keh aap ki on site
17:56jab ab kisi bhi model kujh diji
17:58ko building ko شروع
17:59شروع
17:59شروع
18:00کرتے
18:00tih tih tih
18:00bhoot zhara
18:01مسائل
18:01aatay tih
18:02bhoot zhara problems
18:03aatay tih
18:03coordination
18:04ke andara
18:04aatay tih
18:05cost
18:05ke andara
18:06aatay
18:06ta
18:06ya
18:07time
18:07ke andara
18:07aatay
18:08ta
18:08aatay
18:09aatay
18:10process
18:10jis
18:11ke andara
18:11ya
18:11sari
18:11chis
18:11ka
18:12bhoot
18:12zhada
18:12khiyar
18:13rukha
18:13jata
18:13aatay
18:13aatay
18:13chis
18:14jose
18:14note
18:15jose
18:15record
18:16jose
18:17is
18:18keb
18:18stage
18:18four
18:19operation
18:19and
18:19maintenance
18:20tih
18:20kya
18:20aatay
18:20facility
18:21management
18:22jose
18:22operation
18:23and
18:23maintenance
18:23aatay
18:24jab
18:24aatay
18:25building
18:25ban
18:25giy
18:26ya
18:26to
18:26operation
18:27and
18:27maintenance
18:27aatay
18:28what
18:28happen
18:28that
18:29each
18:29asbit
18:30bim
18:30model
18:30is
18:30handed
18:31over
18:31to
18:31the
18:32building
18:32owner
18:32and
18:32jab
18:33asbit
18:33sara
18:34chis
18:34chis
18:34aatay
18:34record
18:35kare
18:35ljeti
18:35tih
18:35tih
18:36phir
18:36joh
18:36This is often called a digital twin and in this case you call a digital twin.
18:47Facility managers can click on a pump in the model to see its manufacture, warranty, maintenance history.
18:54Facility managers can check its manufacturer code, its warranty, its maintenance history,
19:03it can be integrated with building management systems for real-time monitoring.
19:16It is invaluable for planning, renovation, space management and efficient maintenance operation.
19:27It is invaluable for planning, renovation, space management and efficient maintenance operation.
19:33This is a great tool of planning, space management and maintenance operation.
19:39This is a great tool of managing management.
19:42This is a great tool of monitoring and monitoring.
19:47So, the important thing is that everything is very important.
19:59Okay, so that the video is very long, okay?
20:04I will try to make the stage 5 stimulation and renovation.
20:11And then part two, I will try to explain it in part two.
20:17A model provides accurate information about material use, adding in sustainable deconstruction, recycling and waste management.
20:28So if you have a building, demolition, demolition, it's going to fall, renovate, new construction, new construction, sustainable deconstruction,
20:51it's going to be very helpful and it's going to control the waste management.
20:57In part two, inshallah, I will tell you about the process,
21:03part two, how can you learn the process,
21:07the other way you can do it.
21:10So we keep here until the end,
21:12so that it will be very lengthy.
21:15So I will tell you, inshallah,
21:17if you have a video, inshallah,
21:19allah, peace and blessings,
21:21and blessings be upon you.
21:23And I will tell you,
21:25that you can share with me,
21:29and you can subscribe to your channel,
21:34so that you can do it.
21:36And I will tell you,
21:38I will tell you.
21:49We can share with you,
21:50and we're going to tell you.
21:58No problem.
Be the first to comment
Add your comment

Recommended