Learn how to create initial MEP plans from a linked architectural model in Revit! In this video, we'll guide you through the 5-step process to create accurate and coordinated MEP plans.

What you'll learn:

- Linking architectural models into Revit MEP
- Creating new MEP plan views and setting disciplines
- Using Copy/Monitor to copy elements from the architectural model
- Creating MEP systems and laying out equipment
- Importance of coordination, accuracy, efficiency, and consistency

Keywords: Revit MEP, MEP design, Linked model, Architectural model, Coordination, Accuracy, Efficiency, Consistency, BIM, Autodesk, Revit tutorial

Hashtags: #RevitMEP #MEPdesign #LinkedModel #ArchitecturalModel #Coordination #Accuracy #Efficiency #Consistency #BIM #Autodesk #RevitTutorial #MEPworkflow"

Category

🤖
Tech
Transcript
00:30Assalamualaikum warahmatullahi wabarakatuh.
01:30So,
01:32thank you.
01:38What is initial plan in Revit MEP?
01:41In Revit MEP,
01:42initial plan refer to the preliminary design layout and configurations created during the early stages of a project.
01:49So,
01:51if you have a project,
01:53if you have a project or a preliminary stage,
01:55you will have a new project.
01:57So,
01:59these plans,
02:01these plans,
02:03these plans,
02:05these plans,
02:07typically include
02:09the architecture model,
02:11the architecture model,
02:12which you have linked to the architecture model,
02:14which you have linked to the architecture model,
02:16which you have linked to the label model,
02:18and the new model using the link Revit option.
02:20It is the first option you have linked to the other model in Revit MEP.
02:24The other thing is create a new MEP plan view.
02:29Then you need to create MEP plan views.
02:32As we have to start the views here,
02:35the views also need to be low plans,
02:373D has been a view,
02:38Elevation can be a view,
02:40section can be a view,
02:42we can also use plans,
02:44create a new MEP plan view,
02:47create a new plan view in your MEP project and send the discipline to mechanical.
02:52You can create a new plan to create a new discipline,
02:57or a electrical set,
02:59or a plumbing set.
03:01You can create a new requirement
03:03or you can create a new architecture model.
03:09This is copy and meter.
03:11You can use copy and meter to,
03:14copy elements from the link architecture model
03:17such as wall, flow, roof.
03:19We have given you a new level and grid-ins to copy and meter.
03:24We have many elements to see,
03:28wall, flow, room, wall, features,
03:31mechanical features, architecture,
03:33and all the links from the back and forth.
03:36You can create a new plan to create a new mechanical set.
03:40It is a copy and meter.
03:43It's basically used to create a new tool
03:46that you can create.
03:48So, this is a model that comes out of the way.
03:53Create MEP system. Use regular MEP tool to create system.
03:56Then, if you are doing ductwork or piping or electrical work,
04:02then, if you are doing HVC, you have a supply here.
04:06You have a return here. You have a fresh here.
04:11If you come in the piping, you have a pipeline.
04:15HVC, wastewater, potable, non-potable.
04:20So, you have to design all these systems.
04:24So, you have to create.
04:25The next point is Layout MEP Equipments.
04:29So, after that, you have all the equipment and related equipment.
04:34Place MEP Equipments such as HVAC units.
04:38You have a fan card units, air handling units, cheaters, pumps,
04:44electrical panels and connect them to the system.
04:46And,
04:47whether HVAC equipment or pumps or electrical panels,
04:53then, you have to connect them to the system.
04:56So, you have to connect them to the system.
04:58So, you have to connect them to the system.
05:00Now, you have to connect them through the system.
05:04There is an important question.
05:05The first point is Coordination.
05:07Coordination is very important.
05:08Linking the architecture model is sure coordination between discipline and reduced clashes.
05:13And, the second point is Accuracy.
05:15Accuracy is a lot of way.
05:17The architecture model is basically sure accuracy and reduced error.
05:20Efficiency is a lot of way.
05:22After that, tasks such as copying elements,
05:24in time and effort.
05:25In this case, there is a lot of time
05:27that you can increase.
05:28Because you can get a lot of things
05:30that you can remove from the architecture.
05:33Fourth, consistency here.
05:35Consistency in the design and
05:36documentation around the discipline.
05:38Consistency, which you can do,
05:40you can increase.
05:42You can increase.
05:44Now, we are on the way.
05:50Now, let's go.
05:51Now, let's look at our architecture.
05:55Link in the architecture plan.
05:57The main is the architecture.
05:59The sub-discipline is the base plan,
06:02the floor plan,
06:03and the floor plan.
06:06Now, let's look at the mechanical plan.
06:10I will go to the view.
06:12Floor plans are my part.
06:14Floor plans are my part.
06:15Floor plans are my part.
06:17So, you can see here,
06:19mechanical plan.
06:20And the mechanical point is sub-discipline.
06:23You can see here,
06:24the sub-discipline and the sub-discipline.
06:25The plan is the final plan.
06:26The plan is mechanical.
06:26On the top,
06:27and the sub-discipline will be the top.
06:28As you know,
06:28the sub-discipline will go with.
06:30Okay.
06:30Apply and then do this.
06:32And then,
06:33you can use your node,
06:34do not duplicate existing fields.
06:38You can click on your node.
06:39And then,
06:40you can select it.
06:41You can select it.
06:42Shift the bar,
06:43and then you can select it.
06:44You can select it.
06:45Like I will do this.
06:46You can select it.
06:46I will do this.
06:47I will show you how to make the mechanical key.
06:50I will show you how to make mechanical key.
06:52I will show you how to make mechanical key.
06:54And then you will show the floor plan.
06:57Now you can rename them.
06:59First, you can say entry level is 0-1.
07:01I will say ground floor.
07:04Ground floor.
07:07At we.
07:08It depends on what you can do.
07:12Whatever you can do.
07:14You can do it.
07:16You can take the floor.
07:18We will go and rename it.
07:20Here we go and do it.
07:22First floor.
07:24First floor.
07:26At we.
07:29At we.
07:30As you can do it.
07:32So you will show all the names.
07:36So you will know how to make the plan.
07:41And how to make the plan.
07:44Okay.
07:46Second floor.
07:48Second floor.
07:50At we.
07:51At.
07:52At.
07:53At.
07:54At.
07:55At.
07:56At.
07:57At.
07:58At.
07:59Then.
08:00At.
08:01At.
08:02We have to rename it, and we also say,
08:05Roof, Roof H-V-A-C,
08:10H-V-A-C,
08:13that you know, all types of names that you have.
08:17If you are seeing a new name,
08:18you can check out Roof 4SB4.
08:21If you are seeing a pattern,
08:23you can see that you can see,
08:26and there are many names from you
08:29that you have to know.
08:30Yeah, it's not that it's the city plan.
08:32Because it's the city plan.
08:34Which is the city plan.
08:36Because city plan is the city plan.
08:38City plan is the city plan.
08:40So city plan is the city plan.
08:42You go here.
08:44And you go here.
08:46You set it up.
08:48You set it up.
08:50You go here.
08:52You have mechanical.
08:54And discipline is the OK.
08:58OK.
09:00Then all these events are the same.
09:02The city plan is the same.
09:04Do not cut it up.
09:06Then all these events are here.
09:08And after all these events,
09:10You get it to come.
09:12And then when you go here,
09:14You're still going to the city plan.
09:16You go here now.
09:18All these events,
09:20You have all the city plans.
09:22And the city plan to rename it
09:24And the road plan to rename it.
09:26这次 mentions نا ব ব ব ব ব ব ব ব ব ব ব ব বག ব� Pronunciation ෺ ব বད� বབ বུག০ বགદ বསས বདས বྱབ বག ব ব বག বག বརང� বས বསས বདས বྲད বག বསུས বྱམའད
09:56First, here we call portable water.
10:03Portable water.
10:05We call portable water, we say, you can apply, you can apply, you can apply, you can apply.
10:11We made all of the videos with the someone who has a slide.
10:16We also have a slide of both storvals.
10:19And you can check, you can apply, your plumbing as well, the portable water is all over.
10:25This is a better scenario that we can select the ceiling plans, and we can select the floor plans, so we can select the floor plans, so we can select the floor plans.
10:46We will choose the ceiling plans, so we can select ceiling plans, so we can select ceiling plans.
10:57In this case, we can select ceiling plans and use the ceiling plans, so that we can select the floor plans with the ceiling plans.
11:04to see the first floor ceiling architecture plan, second floor ceiling architecture.
11:10This way you can build a base plan, then you can build a base plan.
11:17Then you can build a mechanical plan.
11:20You can build a seething plan.
11:24Login metro
11:30and now you have to paste your map.
11:33You can build a adapter and founder of the SpaceX.
11:38Aquí.
11:40Theح vidéos is often for 사람이 unars.
11:45so this editor can be made.
11:51foreign
12:03foreign
12:09foreign
12:15foreign
12:19If you have an army or fire protection or fire fighting, then you can select the duplicate.
12:27You can select the duplicate and select the duplicate and select the fire protection.
12:34Fire protection.
12:39The name will be made.
12:47The filter will be made.
12:48The filter will be made.
12:50The structure will be made.
12:53The mechanical will be made, electrical will be made.
12:59The filter will be made.
13:04foreign
13:10foreign
13:16foreign
13:22foreign
13:28foreign
13:32.
13:38.
13:52.
13:55.
13:59foreign
14:09foreign
14:19foreign
14:23foreign
14:27
14:31
14:37
14:47
14:54So this exercise, which I had, I had to make a link to an architecture model that you have to create a plan for mechanical, plumbing, electrical, plumbing, electrical, so that I could make it better.
15:10So, I think that this exercise will be better and better.
15:14So, you can go to your work and go to your work.
15:18and we will be able to share this with you.
15:25Allah Fui Aslamu Alaikum wa rahmatullahi wa barakatuh.
Be the first to comment
Add your comment

Recommended