One of the final steps of the 2nd story #house demolition is to remove the porch and wooden siding. The entire deck is currently being ripped out, along with the patio cover and the adjoining walls. The main structure of the building will remain intact, but everything around it is on it’s way out. Stay tuned for this project’s conclusion tomorrow!
Click here for more on Master Demolition Inc.’s house demolition services. https://goo.gl/RB956l
Be the first to comment