Zum Player springenZum Hauptinhalt springen
  • vor 1 Woche
The History of the Paracelsusbad: From Post-War Spa to a Modern Million-Dollar Money PitThe Old Paracelsusbad: Birth and EraThe old Paracelsusbad opened its doors in 1956 in the heart of Salzburg on Auerspergstraße. The original complex, which included an indoor pool, a spa treatment facility, and a congress center, was designed by the renowned Salzburg architects Otto Prossinger and Adolf Worsch. Together with the adjacent hotel, its purpose was to reposition the post-war city as a modern international spa and convention hub.The old bath served the people of Salzburg for exactly 60 years before closing permanently on 30 November 2016. Although the building's infrastructure was deteriorating, there was significant resistance to its demolition from parts of the local population and heritage preservation groups. Many locals were deeply attached to their nostalgic memories, the classic 1950s charm, and the integrated architectural artwork. To ease tensions, the city promised to carefully dismantle and store key artworks in the Salzburg Museum, and sold old locker keys and inventory to collectors.The New Construction: The Heinz Schaden EraThe Mayor of Salzburg at the time, Heinz Schaden (SPÖ), was the primary political driver and force behind the mega-project. For him, the new building was to be a visionary monument of modern architecture and public infrastructure in the city center.The architecture firm Berger+Parkkinen (Tiina Parkkinen and Alfred Berger) ultimately won the design competition for the new prestige project. Their futuristic design stood out with a facade of white ceramic louvers and a wave-like ceiling structure that dramatically lifted the third-floor swimming pool above the Mirabell Gardens.Costs, Benefits, and the Structural DisasterBenefits: The new Paracelsus Bad & Kurhaus offers a highly efficient sauna complex with panoramic views of the historic old town, a state-of-the-art spa facility, and exceptional sustainability. It became the first indoor pool in Austria to receive the "klimaaktiv GOLD" certification for extreme energy efficiency.Costs: Construction costs skyrocketed significantly, ultimately settling at around 58 to 59 million Euros.The Disaster: The project turned into a structural nightmare due to severe construction defects. Acute safety hazards caused by falling parts of the wave-like ceiling forced the complex to shut down completely in 2023. Years of renovations and legal battles followed. After a brief reopening, new damages emerged in early 2025, triggering another 750,000 Euro ceiling repair. The bath was closed for nearly half of its first five years in operation.Can Locals Still Afford the Pool?Economic turbulence and high inflation led to steep price increases, which drew sharp criticism in local politics. Following price reforms, the standard entry fee rose from 6.00 Euros (for 2 hours) to 8.00 Euros (for 2.5 hours)—a tariff increase of roughly 25% to 33%.

Kategorie

✨
Menschen
Transkript
00:28Untertitelung des ZDF, 2020
00:58ZDF, 2020
01:08ZDF, 2020
01:57ZDF, 2020
02:27Untertitelung des ZDF, 2020
02:57Untertitelung des ZDF, 2020
03:27Untertitelung des ZDF, 2020
03:43Untertitelung des ZDF, 2020
03:54Untertitelung des ZDF, 2020
Kommentare

Empfohlen