After getting the trench dug to spec and leveled and after getting the gravel delivered, I finished the first leach field. I need to spread the straw on top of the entire trench then call for the inspection. IT took way longer than expected but that s ok. Next week I will finish the other two and backfill.
https://www.facebook.com/RPRIdaho/
Instagram: @redpoppyranch
https://www.pinterest.com/redpoppyranch/
Contact: Redpoppyranch98@gmail.com
Norwesco Plastic Tanks https://www.norwesco.com/
Video about Lifevantage products and the science behind them.
https://www.youtube.com/watch?v=Bs8ecK_Z2z0
Link to these products: http://redpoppyranch.lifevantage.com/
Music: http://www.epidemicsound.com/
Comments