Finally ready for the major inspection. The inspector came out and looked over the tank and first leach field. I had to make two minor adjustments then backfill the tank and leach field. Now I need to dig the other two leach fields then tie them into the distribution box then all done.
https://www.facebook.com/RPRIdaho/
Instagram: @redpoppyranch
https://www.pinterest.com/redpoppyranch/
Contact: Redpoppyranch98@gmail.com
Norwesco Plastic Tanks https://www.norwesco.com/
Music: http://www.epidemicsound.com/
Comments