00:00who would have thought coastal road collapse repair works like this excavators clear all
00:04cracked broken sections then steel sheet piles driven in completely blocking seawater out
00:08cutting machine trims the intact road surface ensuring new and old structures connect seamlessly
00:13soft mud and debris cleared down to solid base concrete poured to lock the foundation large
00:17stones added for reinforcement concrete poured again bonding everything into one unified structure
00:22once base is fully stable crushed stone laid for leveling standard road construction completes the
00:26surface road now withstands tidal pressure without collapsing next mountain cliff collapse section
00:33excavator clears all cracked loose road surface heavy steel frames erected as supporting skeleton
00:37formwork installed rebar laid across everything concrete poured across entire structure once
00:42cured standard road construction completes the surface safe and solid finally village road
00:47transformation bulldozer clears all weeds loose soil and mud crushed stone layer spread and compacted
00:52flat by road roller base stable asphalt laid directly lane markings painted within a few hours a smooth
00:59village road is complete