00:00In the morning of this Sunday, October 12th, Bogotá was witnesses of the explosion of two
00:04bridges in the intersection of the street 13 with Carrera 50 and Avenida de las Américas,
00:08all to give a great work to improve the future flow vehicle in the area.
00:13A pesar of certain changes generated by a problem with an electric connection in a column
00:18of the area, the explosion controlled was carried out in the vehicles of El Pulpo,
00:23in the place of Puente Aranda with normalcy. This demolition, which lasted around 11 seconds,
00:28will be needed to be a new interchangeable of three levels, similar to the NQS that connects the NQS
00:33with the 6th Street Street, which includes a mix, exclusive to Transmilenio and Puentes Elevados.
00:39The Puentes that connect the 13th Street Street with Avenida de las Américas,
00:43the Carrera 50 and 4 Arterias Viales Más built in 1983 to improve the mobility of a
00:49Bogotá of 4.000.000 inhabitants, but they were not demolished, so they were demolished.
00:54This infrastructure will be one of the components of the first tramo of the project Nueva Calle 13,
00:59which will change for forever the mobility of this Neurálgico Corredor Neurálgico of the city.
01:03The megaproyecto Nueva Calle 13, financed by the NQS in a 70% and by the District in a 30%,
01:10is divided into five frontes of obras or tramos. What we see in these days is part of the future
01:15of
01:16the mobilization bogotá, a chapter in which every semáforo, every desvío and every protest
01:20serán mensajeros de la tensión entre sueños y caos urbano.
Comments