00:00which is our project.
00:02We have got a 7000 cubic meters in our K-C,
00:10which is in 7550,
00:13and in WPLC,
00:17and in the Stirling-k channel,
00:19there is a 500 cubic meters in our K-C.
00:29I will tell you about 2.5 million acres of water in the dam.
00:33There will not be any amount of water.
00:39We will get a total of 4,6,000 hectares.
00:47We will get a total of 4,6,000 hectares.
00:58Yes.
00:59When I was tired of it, I was tired of it.
01:02When I was tired of it, I was tired of it.
01:08It was very low.
01:10Do you not have to reach there yet?
01:11No.
01:12Okay.
01:14The problem is that,
01:15I was given a flood of 5-6 years.
01:20It was not yet.
01:21After giving water, the government stopped.
01:25It was very high.
01:28After living in a tree,
01:30it had got dried up in a tree.
01:32And the water was free of water.
01:35All was clean.
01:37It's only 1-3 cheveguis.
01:43If it got is clean enough,
01:45it would still get dried.
01:48It would still get dried.
01:49It would still be used to create dried.
02:03Thank you very much.
Comments