00:00You know, in the world of big, complex projects, the way you set up your team can literally be
00:06the difference between a soaring success and a complete disaster. So today, we're going to dive
00:12deep into a method that totally changes the rules of the game. It's called Integrated Project
00:16Delivery, or IPD. Welcome! Here at Unified Consulting Solutions, our whole mission is to
00:23simplify complexity so that you can amplify performance. And that is exactly what we're
00:28going to do today by breaking down IPD. It's a seriously powerful tool for getting your projects
00:33to perform at their absolute peak. All right, so here's our game plan. First, we'll look at why the
00:38old-school methods just don't cut it anymore. Then, we'll introduce IPD, get into how it works,
00:43and talk about the core ideas that make it so powerful. And of course, we'll wrap up by looking
00:47at the results and what you can do next. Now, here's my promise to you. By the time we're done
00:52here, you are going to have a rock-solid grasp of IPD. You'll see the cracks in the old way
00:56of doing
00:57things, and you'll understand exactly how IPD paves a better path forward, right down to its
01:01structure and that game-changing idea of shared risk. So, let's get started by looking at the
01:06problem. Okay, first things first, we have to really understand the problem we're trying to solve.
01:12The most common way projects get done, what's called design-build-build, has this one huge
01:18fundamental flaw. It's basically a system of misaligned interests. And this slide right here,
01:24it just lays out the two competing worlds perfectly. Over on the left, you've got the
01:28traditional model, right? Fragmented teams, everyone in their own silo, this rigid step-by-step
01:33process, and a contract that often just goes to the lowest bidder, which, let's be honest,
01:38pretty much guarantees a fight. But on the right, IPD is the complete opposite. You have one integrated
01:44team from day one, collaborative phases, you pick your partners based on who's best for the job,
01:49and, this is the big one, everyone's interests are aligned. This old setup creates what's known
01:55in game theory as a classic prisoner's dilemma. It's this weird situation where two parties,
02:00by just doing what's best for themselves, actually end up with a worse result for everybody.
02:06Think about it. The lowest bid-wins model forces contractors to shave their profits down to nothing.
02:11So to make any money at all, they have to defend every little part of their scope,
02:15which leads to arguments over every single change instead of working together to find
02:19what's truly best for the project. And the fallout from this mindset is massive. You've got the owner,
02:25the designer, the contractor, and each of them is just trying to protect their own little profit
02:29bucket. The contractor isn't even in the room during the design phase, so simple construction
02:33problems don't get spotted until it's too late, and that means expensive rework. Risk isn't shared,
02:39it's just shoved down the line to the next person. And what's the result? A culture of conflict,
02:43constant battles over change orders, and in the end, higher costs and bigger delays for everyone.
02:49So if the traditional method is so broken, what's the alternative? Well, this brings us to
02:55integrated project delivery. And it's so important to see IPD not just as a different process,
03:00but as a whole new philosophy, a shift from fighting each other to working together.
03:05This quote really gets to the soul of IPD. The entire system is built on a foundation of
03:11collaboration, trust, respect, and wide open communication. It's all about creating an
03:17environment where the team can actually work together to hit the project's goals instead of
03:22just chasing their own. So what is it really? Well, at its core, IPD is a delivery method that legally
03:30locks in the business interests of the key players, the owner, the designer, and the contractor.
03:35They're all bound together by a single multi-party agreement. This contract literally forces them to
03:40act as one team with one shared goal, optimize the project, boost value, slash waste, and just make
03:46everything more efficient for everyone. Okay, so now we get the why behind IPD. But what about the how?
03:52How does an IPD project actually get off the ground and work day to day? Let's break down the
03:57specific structure and the life cycle of a project. The whole structure starts with what's called a
04:02project management team, or a PMT. You can think of this as the project's command center. It's got
04:08leaders from the owner, the consultant, and the contractor, and they make all the big decisions
04:12together, unanimously. This makes sure every choice is what's best for the project. If they ever get
04:18stuck, a senior management team steps in, and all the hands-on work? That gets done by specialized
04:23project implementation teams, or PITs. The project itself moves through four very distinct
04:28phases. It all kicks off with a validation phase, just to make sure the project's goals are solid
04:33and it's actually feasible. Then you move into the collaborative design and procurement phase.
04:38This is where the whole team works on the plans together. After that, of course, comes the
04:43construction phase. And finally, the warranty phase, where the team sticks together to handle any
04:47last little issues. So, we've got a collaborative structure and a clear process, but what's the
04:52secret sauce? What really makes it all work? The true genius of IPD is its financial engine,
04:58which completely rewires the incentives for the entire team. And it's all powered by something
05:03called the risk pool. This is brilliant. Instead of each company having its own profit to protect,
05:09the profits of the consultant and the contractor are all thrown into one big shared pot. And this
05:14entire pool of money is put at risk. It only gets paid out if the team as a whole meets
05:19its goals,
05:19especially finishing the project at or under the target costs they all agreed on.
05:23The bottom line here is simple. Everybody wins together or nobody gets their profit.
05:28This one mechanism is what solves that whole prisoner's dilemma.
05:31Now, this all sounds fantastic on paper, right? But does it actually work in the real world? Well,
05:37let's take a look at the data. The results show a really clear and compelling advantage for the IPD model.
05:42This chart tells the story with cold, hard data. It's comparing the project percent change,
05:49which is basically a fancy way of saying cost overruns and major changes, for traditional
05:54projects versus IPD projects. And the difference is, well, it's stark. The data shows again and again
06:00that IPD projects have way lower cost growth and fewer changes. And what that means for the owner
06:05is more predictability and just plain better performance.
06:09And this really gets to the big wins with IPD. Because everyone's interests are aligned,
06:14you see a huge drop in change orders and delays. The collaborative environment actually encourages
06:20innovation. Because the team is free to explore better ways of doing things without being afraid
06:24of getting hit financially. It builds that best for project culture we've been talking about.
06:29And it swaps out the high cost of conflict with the incredible value of cooperative,
06:33pro-social behavior. Wow, we've covered a ton of ground here. From the deep flaws in the old way
06:40of doing things to the structure and amazing benefits of IPD. So let's quickly recap the main
06:45points and talk about how you can actually put this knowledge to work. So what are the biggest
06:50takeaways? If you remember nothing else, remember these five things. Number one, the traditional way
06:56creates conflict. Number two, IPD aligns everyone with a single contract. Number three, that shared risk
07:03pool is the financial secret sauce. Number four, the process is structured and collaborative. And number
07:08five, the results don't lie. IPD flat out leads to better projects. And if we circle back to our goals
07:15from the beginning, you can now confidently spot the problems with the old way, define what IPD is, walk
07:20someone through its structure, explain that crucial concept of shared risk and reward, and list off all the key
07:25benefits of making this shift. So are you ready to amplify your project's performance? At Unified
07:32Consulting Solutions, founded by Dr. Morimuthu Kay, we're building a whole community around these
07:37powerful ideas. If you got something out of this, I'd love for you to join our conversation over on
07:42LinkedIn. The link is right there in the description. And hey, if you want more explainers like this one,
07:47make sure you like, share, and subscribe so you don't miss a thing. And for those of you who want
07:52to dive
07:52even deeper, all the information we talked about today was based on these key sources.
07:57Thank you so much for joining us, and we can't wait to see you next time.
Comments