Skip to playerSkip to main content
Saksi is GMA Network's late-night newscast hosted by Arnold Clavio and Pia Arcangel. It airs Mondays to Fridays at 10:20 PM (PHL Time) on GMA-7. For more videos from Saksi, visit http://www.gmanews.tv/saksi.


#GMAIntegratedNews #KapusoStream


Breaking news and stories from the Philippines and abroad:
GMA Integrated News Portal: http://www.gmanews.tv
Facebook: http://www.facebook.com/gmanews
TikTok: https://www.tiktok.com/@gmanews
Twitter: http://www.twitter.com/gmanews
Instagram: http://www.instagram.com/gmanews


GMA Network Kapuso programs on GMA Pinoy TV: https://gmapinoytv.com/subscribe

Category

🗞
News
Transcript
00:00Inilunsad po ngayon araw ang Sumbong sa Pangulo website kung saan pwedeng mamonitor ng publiko ang mga flood control projects sa buong bansa.
00:08Ikinababahala rao ni Pangulong Bobo Marcos na labin limang contractor lang ang nakakuha sa isang daang bilyong pisong halaga ng mga proyekto o katumbas ng dalawampung porsyento ng kabuang pondo.
00:22Saksi si Marie Zumali.
00:23Uulan, babaha. Huhung pa ang tubig. At kapag muling umulan, uulit lang ang proseso.
00:34Pero minsan hindi pa nga nawawala ang baha, madaragdagan na naman.
00:38Kaya maraming napapatanong, nasaan ang mga flood control project?
00:43Nagparinig pa nga si Pangulong Bobo Marcos sa huli niyang State of the Nation address saan niya ay mga nagsasamantala.
00:49Iyan naman kayo sa inyong kapag Pilipino.
00:52Batay sa paunang pagsusuri, sabi ng Pangulo ay aabot sa mahigit 545 billion pesos ang inilaan para sa halos 10,000 proyekto kontrabaha sa buong bansa mula Hulyo 2022.
01:06That is a very big number by any measure. That is an enormous number.
01:12At ang ikinababahala ng Pangulo, tila nak-corner down ang 15 contractor ang tinatayang 100 billion pesos na halaga ng mga proyekto o 20% ng kabuoang pondo.
01:23This is another disturbing assessment sa 50%.
01:2820% of the entire 545 billion budget napunta lang sa 15 na kontraktor.
01:36Sa 15 na kontraktor na yan, lima sa kanila ay may kontrata sa buong Pilipinas.
01:46That for me was the one that stood out very much.
01:50Five of these contractors had projects in almost the entire country.
01:59So those are the ones that immediately popped out na sa aking palagay ay kailangan natin tignan.
02:06Tinukoy din ang Pangulo ang pangalan ng limang sinasabi niyang contractor na may proyekto sa halos buong bansa.
02:13Hinahanap pa namin ang mga kontratistang binanggit ng Pangulo para mahingan sila ng pahayag.
02:18Isa pang obserbasyon ay may mahigit 6 na libong proyekto na nagkakahalaga ng mahigit 350 billion pesos
02:24na hindi tinutukoy ang eksaktong uri ng flood control na itinatayo.
02:29Buko dito, marami rin daw proyekto sa iba't ibang lokasyon ang may eksaktong magkakaparehong halaga ng kontrata.
02:35It is impossible for one barangay, even if they are the next barangay,
02:40to have the exact same project to the exact same amount with the exact same contractor.
02:48Imposible yan. And that is why that is a significant finding already that we have made.
02:56Ipinagtataka rin ang Pangulo kung bakit hindi tumutugma ang mga probinsya may pinakamaraming flood control project
03:01sa top 10 na pinakabinabahang probinsya.
03:04Now, I'm sure there are explanations for that. We will have to study it further.
03:09But you would intuitively say that projects, the areas rather, the provinces, regions, whatever you want to do,
03:20whatever pinaka-flood prone, yun dapat ang pinakamarangong probinsya.
03:24Sabi ni Pangulong Marcos, paunang pagsusuri pa lamang ito at wala pa naman daw inaakosahan.
03:30Kaya tinihimok niya ang taong bayan na makibahagi at magsumbong sa kanya mismo ng kanilang mga nadidiskubre
03:37sa pamamagitan ng website na sumbongsapangulo.ph na inilunsad niya ngayong araw.
03:42Kasi parang sinasabi ng mga iba, makikita naman namin, hindi maganda, pero wala naman kami mapuntahan,
03:49wala naman kami malapitan. Ngayon, meron na, ako mismo.
03:52Dahil akong clickingin dito araw-araw sa website natin at babasahin ko ang report na ibibigay ng taong bayan.
04:01Pagkatapos niyan, ininspeksyon ang Pangulo ang dalawang proyekto sa isinagwang Phase 4 ng Pasig Marikina Flood Management Program.
04:07Partially funded yan ang Japan International Cooperation Agency o JICA
04:12at posibleng matapos sa 2028 at 2030 ayon sa DPWH.
04:17Inutusan din ang Pangulo ang DPWH na pag-arala ng ibang posibleng containment structures sa watershed ng Sierra Madre.
04:24Nagsasagawa na raw sila ng feasibility study at nakikipag-usap sa Japanese government para pondohan ang mga proyekto.
04:32Para sa GMA Integrated News, ako si Mariz Umaliang inyong Saksi.
04:37Mga kapuso, maging una sa Saksi.
04:39Mag-subscribe sa GMA Integrated News sa YouTube para sa ibat-ibang balita.
Comments

Recommended