00:00Hello friends, welcome to Khempur Repair YouTube channel.
00:04Friends, I have this 12012 2 Amp Task Farmer.
00:08This task farmer is new.
00:10But if you don't have a new one,
00:12and it is an old task farmer,
00:14and your home theater is not working,
00:16because it is a home theater,
00:18that's why I am talking about home theater.
00:20If your home theater is not working,
00:22then you have a little confusion
00:24that there is a problem in the home theater
00:26or in the task farmer,
00:28then how will you find out?
00:30Or if you are installing an old task farmer
00:32in the home theater,
00:34then how will you check it,
00:36so that you know
00:38that if you have an old task farmer,
00:40then it is correct or not.
00:42So friends, I will tell you two ways.
00:44One, I will tell you how to check with the light.
00:46Second, I will tell you how to check
00:48with this type of digital meter
00:50that how you can check
00:52this task farmer,
00:54how you can find out
00:56whether it is working or not.
00:58It is going to be a very simple video.
01:00I am going to tell you in a very short time.
01:02Friends, first of all, what we have to do
01:04if we have an old task farmer,
01:06or if it is new,
01:08then you can check it in the same way.
01:10Whenever you check it with an AC volt light,
01:12then this red wire
01:14will be of AC volt.
01:16And these will be the output wires.
01:18These are also of AC volt.
01:20But the current in it,
01:22you can touch it with your hand.
01:24So there is no problem with this.
01:26Okay.
01:28We don't have to do anything
01:30with this red wire.
01:32For now, we have to connect
01:34this red wire with a main lead.
01:36Okay. So I have
01:38this type of main lead.
01:40You can see.
01:42You can connect both the wires
01:44with each other.
01:46Like I am doing.
01:48Keep in mind that
01:50whenever you want to check a task farmer
01:52for the first time,
01:54then you have to remember
01:56that if your task farmer is new,
01:58then there is no problem.
02:00New task farmers are very less bad.
02:02In an old task farmer,
02:04there may be a shortage.
02:06So if you have an old task farmer,
02:08then you don't have to connect it directly
02:10to the AC volt.
02:12If there is a shortage,
02:14then if you are doing it with an inverter,
02:16then the inverter may be damaged.
02:18If you are doing it with a light,
02:20then use a series testing board.
02:22Whenever you check anything
02:24that works with AC volt,
02:26like a task farmer or anything else,
02:28then you have to connect
02:30the first wire like this.
02:32Okay.
02:34And the second wire,
02:36you don't have to connect
02:38this wire with this.
02:40I will tell you this.
02:42If you need light,
02:44then check this task farmer with AC volt.
02:46Otherwise, you can do it with a meter.
02:48Now let me connect this plug
02:50to the power supply.
02:52I am connecting this to the series.
02:54Whenever you want to check,
02:56you have to check the series.
02:58Okay.
03:00This wire has AC volt.
03:02So you have to check it very carefully.
03:04First, you have to check
03:06whether the series is working
03:08by connecting both the wires.
03:10The series is glowing.
03:12I will show you the bulb.
03:14The series is working.
03:16Now you understand
03:18how to check the task farmer.
03:20First, you have to
03:22put it on the body and check.
03:24If your bulb burns a little,
03:26then your task farmer
03:28has a shortage of the body.
03:30Okay.
03:32You can also check
03:34this wire one by one.
03:36If your bulb burns on any wire,
03:38then you can understand
03:40that your task farmer is bad.
03:42Finally, you have to connect
03:44the plug to the series.
03:46The bulb is not burning at all.
03:48I can feel the voltage drop.
03:50There is also a spark.
03:52This shows that
03:54our task farmer is good.
03:56Now I will remove this plug
03:58from the board.
04:00You can check the shortage
04:02of the task farmer in this way.
04:04Now I have connected
04:06the other wire to the series.
04:08Now you have to connect
04:10the plug to the series again.
04:12You do not have to touch this.
04:14You have to keep the task farmer here.
04:16You have checked that there is no shortage
04:18in the task farmer.
04:20Now you touch the middle wire
04:22one by one with both the wires.
04:24There is a spark.
04:26Here too.
04:28There is no problem
04:30in the task farmer.
04:36There is no problem.
04:38In this way,
04:40the task farmer is checked with AC volt.
04:42This is the method of the series.
04:44How to check with the meter?
04:46I will tell you.
04:48For this, we have to do the same
04:50for the meter.
04:52We will know all this
04:54on continuity.
04:56I will switch on the meter
04:58and put it on continuity mode.
05:00This is a very easy method.
05:02If you do not have a meter,
05:04you can do it with the series.
05:06But you have to check very carefully.
05:08There are two props here.
05:10Red and black.
05:12You have to put it on both the wires.
05:14First, you have to check the continuity.
05:16The continuity here is
05:18149.
05:20It is 4849.
05:22This continuity is of the right task farmer.
05:24If your task farmer
05:26has a shortage,
05:28then you will get continuity around 3.
05:30You will get it around 1, 2, 3.
05:32That means there will be a shortage.
05:34If there is no continuity,
05:36you can understand
05:38that your task farmer is still bad.
05:40The first thing you have to check
05:42is that there is a continuity of 150.
05:44The second thing you have to do is
05:46put a prop on the body and check.
05:48There should be no continuity
05:50from the body.
05:52Not even 1, 2, 3.
05:54The third thing you have to do
05:56is to check these three wires one by one.
05:58You should not get anything here.
06:00There should be only one wire in your meter.
06:02Your task farmer
06:04is better than the AC wire.
06:06First, I have taken
06:08a 24 volt wire.
06:10Now, I will take a 12 volt wire.
06:12The continuity here is
06:143.
06:16This is fine for now.
06:18If we check this,
06:20the continuity here is 5.
06:22This is fine for now.
06:24Let's check this again.
06:26There should be 3 here.
06:28There is also 3 here.
06:30If the AC output
06:32is bad,
06:34then there will be no continuity of 3
06:36and there will be no beep.
06:38If there is no beep,
06:40then your task farmer is bad.
06:42This way, you can check
06:44any task farmer.
06:46Keep in mind that if the task farmer
06:48is bigger than 2 A,
06:50then you may see less or more
06:52continuity.
06:54If you like this video, like it, share it
06:56and comment on it.
06:58See you in the next video.
07:00Thanks for watching.