Navisworks Quantification (QTO) & 5D BIM – Creating a Quantification Workbook | Step-by-Step Tutorial
In this tutorial, you will learn how to use Autodesk Navisworks Quantification to perform Quantity Takeoff (QTO) and create a structured Quantification Workbook for 5D BIM cost estimation.
We will go through the complete practical workflow, starting from preparing the BIM model and creating the Quantification Workbook to extracting quantities, adding resources and unit rates, calculating costs, and preparing a BOQ-style output.
🏗️ Complete 5D BIM Workflow
3D BIM Model → Quantity Takeoff → Quantification Workbook → Model Quantities → Resources → Unit Rates → Cost Calculation → BOQ → 5D BIM
This tutorial is useful for BIM Engineers, BIM Modelers, Quantity Surveyors, Estimators, Civil Engineers, Architects, MEP Engineers, Contractors, Project Managers, and Construction Professionals who want to understand model-based quantity takeoff and cost estimation using Navisworks.
If you are learning Navisworks Manage and want to develop practical BIM coordination and 5D BIM skills, this tutorial will help you build your knowledge step by step.
👍 If you find this tutorial useful, please Like, Share, Subscribe, and turn on the notification bell 🔔 for more BIM, Revit, Civil 3D, Navisworks and construction technology tutorials.
🔑 Keywords
Autodesk Navisworks, Navisworks Quantification, Navisworks QTO, Quantity Takeoff, QTO in Navisworks, Quantification Workbook, Navisworks 5D BIM, 5D BIM, BIM Quantity Takeoff, BIM Cost Estimation, Navisworks Cost Estimation, BIM Quantification, Construction Quantity Takeoff, BOQ, Bill of Quantities, Quantity Surveying, BIM Estimation, Navisworks Tutorial, Navisworks Manage Tutorial, Navisworks Training, BIM Training, Model Based Quantity Takeoff, Revit to Navisworks, Construction Cost Estimation, BIM Cost Management.
🏷️ Hashtags
#Navisworks #NavisworksQuantification #QTO #QuantityTakeoff #5DBIM #BIM #BIMTraining #NavisworksTutorial #NavisworksManage #BIMQuantityTakeoff #CostEstimation #BOQ #QuantitySurveying #Construction #BIMEngineering #Revit #ConstructionManagement #BIMEstimator #QuantityTakeoff #Autodesk
Transcript
00:11May God’s peace, mercy, and blessings be upon you. In the name of God, the Most Gracious, the Most Merciful.
00:15Please tell me what is the meaning of the message, what is the meaning of this message?
00:20لئے
00:22What is the meaning of the story?
00:26What is the best way to do this? What is the best way to do this?
00:31Then I made a reservation on one side or another that came to my mind.
00:35This is the reason why this situation is so rare that it is too big to come to you.
00:38Kia Kia چیزیں
00:43This is the place where we go
00:47ہے To and
00:52To Kia Hoti To Kia Hoti To Kia Hoti To Kia Hoti To Kia Hoti
00:54This new work Quantification is the process of extracting
00:59measurable quantities from your 3d module
01:04Process
01:09Walk in contents from the 3d module on the go 3d module
01:14length is the length of the silence area
01:18Volume Silence count Count Silence and material
01:21quantities and organize them into a work
01:26This workbook can be organized in detail then it can be
01:30Used for quantity take up and cost estimation
01:35Moisturizing when it comes to moisturizing when it comes to it
01:38Please note that the quantity taken up and cost estimation is important.
01:41What is it?
01:45quantification in lavish work the quantification tool allows you to
01:50take information from bim model quantification
01:54Allow the card to receive information.
01:56bim model The atom is extracted from the card and then the atom is silent.
01:59Structured quantity take off for example from a building
02:04model you can calculate What this means is the exact assumption example
02:07Develop the new model of the concrete wall.
02:11model element concrete walls and sides
02:14Quantities of each side model elements of each side
02:17Concrete walls can be installed at 800
02:21ہے ٹھیک ہے S کے after concrete atmosphere ہے slabs a رہی ہیں
02:26Share this video on your YouTube channel after clicking on it.
02:30And that number is the same as the last one and the next one
02:36There is a large lamp on your hips as well.
02:43What's wrong with this place?
02:46example
02:50He did not remain silent, he went crazy, and he did not remain silent.
02:53And then the console went there.
02:57Forget about my life, I mean, it's coming to me here.
03:01If you want to know how to use your phone's keyboard, you can use this phone number
03:04All you have to do is get these properties.
03:11If you have a secret, this is the same as the story you want.
03:15Why don't you tell me what you need to know where to buy it?
03:19This is almost the same as if there is a story about it.
03:23This is what you think about this model.
03:26Your fitness is the same as your generation card.
03:30Go to the bottom of the line and let it go to the bottom of your pussy.
03:33There is no connection between the two devices and the card next to it.
03:36When you come or go after the cup comes out
03:39ہے ہے
03:44what is quantification workbook
03:48Basically, what is the topic of this workbook?
03:53This is the most important thing in the world. Study how to do it. Number of words are important.
04:00What is quantification workbook? What is quantification?
04:04workbook is essentially your quantity take off work space in nebis
04:14The quantity is taken off so that it is used as it comes.
04:19it can organize your project into a project
04:23organize your card, for example, number and take off items and resources.
04:28materials, modern quantities, environments, prices, prices
04:31Costs of units of each unit or the cost of the unit
04:35Here is the table for us to talk to you about it.
04:38building project This is where the structure is as a field in this house
04:42walls, doors, windows, floors, structure, two-line structure
04:46Column Beams Slab Name of the line to the pipe touch
04:51cable trays
04:59This section is in the order of this law.
05:02environment in environment connected to 3d model
05:07This is how it is organized, how it is, how it is organized.
05:11ہے ٹھیک ہے Our 3d model کے لیے آپ کو Help
05:15for example each item can have its corresponding quantity
05:19item The corresponding quantities are available and if the name is required
05:24cost information when you go to sleep and stay silent
05:29ہے S کے after number 3 پہ ہے setting up a workbook for quantification ٹھیک ہے
05:36A workbook about setting up a typical set up process
05:40This is step 1 to open your federated model.
05:45That's it, it's all right
05:49network bio and federated model
05:54open your new support project containing the required model app
05:58n a time destinations the required model
05:59The federated model is the first one.
06:02for example rivet architecture code yahan
06:04Revet structure code yahan revet map code yahan
06:07Similar 3d code yahan ifc code yahan to pen code yahan
06:10You can use the approximate tool
06:17Accelerator Accelerator Samar THE始 Chain
06:21Wartnets knowledge of the concept of "khussa" (conveyance of the concept of "stubfs")
06:34The knowledge and performance of the data are not transferred to the point where it remains.
06:41Now you will remain in the state of the woman
06:51If you want to enter, then you want step 3
06:53typically set up process
06:55step 3
06:57Create Select a Workbook
06:59this workbook
07:02is where you organize
07:03your take-off information
07:04JAHÁAú Aپنے organize
07:05take-off information
07:08before marrying anything
07:09Establish your project structure
07:11Sab Se پہلے
07:11project structure
07:14architecture
07:15architecture
07:171
07:192
07:193
07:214
07:235
07:246
07:275
07:295
07:315
07:325
07:325
07:325
07:375
07:395
07:405
07:405
07:425
07:425
07:555
07:555
07:555
07:565
07:565
07:565
07:585
08:126
08:135
08:145
08:155
08:155
08:165
08:195
08:245
08:275
08:285
08:295
08:315
08:325
08:325
08:595
09:005
09:005
09:015
09:115
09:135
09:145
09:155
09:165
09:175
09:175
09:195
09:205
09:235
09:356
09:376
09:446
09:456
09:456
09:476
09:517
09:516
09:526
09:527
09:527
09:537
09:538
09:589
10:009
10:019
10:029
10:2010
10:308
10:319
10:329
10:339
10:359
10:359
10:359
10:4510
10:4710
10:4910
10:5010
10:5610
11:019
11:0310
11:059
11:0510
11:0810
11:0910
11:0910
11:1010
11:1110
11:1210
11:1210
11:12A new number is coming and the number is coming. As soon as the next turn is brought up, the next number is the same number.
11:18That's it
11:23کے پاس آجائے گا
11:24The basic calculation is total cost is equal to quantity into unit rate to the basic calculation
11:30I need to pay the total cost and the quantifications for the unit rate.
11:35پڑائی کریں
11:35This allows your model paste quantity to take up to develop into a cost estimate to go into it quantity
11:42How much quantity is available
11:43Cost estimation How many pictures do you have in the past? The next number
11:51ہے
11:51why setting up the workbook correctly is important
11:56Correctly put the structure in place and set it correctly.
12:00This workbook is the workbook I used to say nothing about this workbook.
12:04workbook gives you better organization
12:10The organization is more silent and accurate measurement is correct.
12:14It is silent, consistent units, and it is silent, model based on quantities, cost information.
12:19or view your report
12:24it also makes it easier to update quantities when the b model changes
12:28It is also easier to do this.
12:34b model
12:37for example if the architecture changes a wall or add 20 doors
12:42You can update the model based on take-off instruct manually recalculating the
12:47Entire quantity of the schedule
12:49for example if you have a small building your workbook could look like this
12:50ٹھیک ہےگر The first building architecture
12:52Changes to the date or time 20
12:56This is what the number is like.
13:00Update the silent model automatically.
13:04This maneuver is very necessary simply for example
13:08imagine a small building your workbook could look like this
13:12Almost anywhere near the building
13:14workbook
13:19Get the information and quantification from the workbook as a name.
13:23quantification workbook Asia Zero One App Architecture Asia
13:26walls two four five zero qubit
13:30One floor on the floor
13:35eight five zero
13:39The number of windows is the same as the number of the windows.
13:42Under the circumstances of the concrete environment
13:46How to use the multi-cube in the same place?
13:50Frame as five two zero zero square
13:55What's the matter with this story?
13:59This is the best place to stay
14:02Oh, I love you, I love you so much
14:07What are the terms and conditions for this topic?
14:10work book
14:13My daughters, my hips, if my pussy is exposed, then create it.
14:16Quantification
14:19Press this as a bar. Press it to come to you.
14:23Here we go, this is the last time we talk about it.
14:27Basically quantification of the project setup ٹھیک ہے
14:30project setup click here
14:33Would you like to view quantification getting started tutorial
14:36Make an assumption that this is a different idea.
14:38Yes, this is the best time to watch. Yes.
14:41When the watch stays silent, let it be like this.
14:44This is why it is necessary to do so.
14:46remind me later
14:49No catalogs Select catalog to
14:52organize your take-up project and catalogs.
14:56predefined settings
14:59Live this civil 3d video here and there
15:02already date
15:07Our building is not predefined catalogs ہوں گے to کے
15:12Under the rear seat of the Kia Toyota ہے ٹھیک ہے
15:14Please tell me what is correct.
15:17Get the correct method for setting up your data.
15:20This is why the Unipharmaceutical system is imposed on your diet.
15:23Unipharma is okay when it comes to this.
15:26After that, the units are the same.
15:29There are many other Saudi Arabs here.
15:32How often does your system work?
15:35How much of Pakistan is this country? How much of America is it?
15:38The imperial system has entered the imperial system.
15:41Do not use your system power button to remove it again.
16:11The subtitles

Recommended