00:00We are here with water logging and water logging.
00:07The most important thing is the water water temperature.
00:10Last time, it's more than 180 mm.
00:13Recently, it's more than 120 mm.
00:16But this is the issue in the 1st.
00:18The water quality is very important.
00:19So, there is an increase in water here.
00:22So, there is a lot of encroachment, we have to plan the drain, cleaning, and the steps that we have
00:33to do.
00:34So, there are steps that we have to do.
00:52So overall, this is a very small drain capacity, it has a very small drain capacity in 6-15 cm.
01:01So in this area, we have a great work plan.
01:05Overall, we have a drainage master plan.
01:10We have a lot of drainage master plan.
01:15in principle, we have a plan for our 40 crores phase 1 tender.
01:22We have a long term vision plan for our Sambalpur Drainage.
01:31a plan.
01:33We need to take care of this.
01:37We need to take care of the project.
01:41We need to take care of this project.