00:0099.9% of old car restorations are just simple car replacements.
00:05But, with a cold smile, he said,
00:07Don't worry, I'm qualified if we're going to do this.
00:10Then we'll do a complete rebirth for the sake of this passion.
00:14Follow our perspective and see what a true Land Rover really means.
00:17This is a Discovery 4 5.0 full restoration.
00:22Brothers, grab your tools, let's strip this old machine down completely.
00:26This video took 3 months and over 130,000 minutes.
00:30So get your snacks ready and let's begin.
01:07Next, we remove the body attachments to prepare for separating the body from the frame.
01:12And the body is separated from the frame.
01:28And the body is also being linked.
01:30Now, on the frame, we use the frame.
01:35The frame will show you, let's turn it into the frame.
01:40The body will show you, let's remove the frame.
01:41The body is separated from the frame and the frame.
01:42and then we continue removing the body attachments all removed parts are
02:03sorted and arranged neatly then we begin body work stripping all the paint to
02:08bring it back to its original factory in areas where dry ice cannot reach use a hot
02:27air
02:27you
03:02Next, we move into the highest level stage of classic car restoration.
03:07Next comes the full electrophoresis process.
03:11Only electrophoresis can truly restore an old car to its peak factory condition.
03:16This is a complete transformation from the inside out.
03:19First, we carry out degreasing to remove oil and impurities from the body surface.
03:24Next, we will take you through an immersive first-person view of the electrophoresis process.
03:43The key step before electrophoresis is phosphating, which forms a dense phosphate crystal layer
03:49on the body surface, creating a rivet-like effect at the microscopic level that allows
03:54the electrophoretic coating to bond more firmly.
03:57The final ultimate stage is the electrophoresis, driven by electric current, negatively charged
04:03paint particles move precisely toward the positively charged body and attach evenly, achieving full
04:09360-degree coverage with no blind spots.
04:13Then, it is sent into a high-temperature oven and cured at 220 degrees, forming a hard
04:18and smooth protective layer.
04:20Next, we begin the chassis restoration.
04:22After so many years, there is clear oil leakage from the engine and transfer case, so we will
04:27start by cleaning everything through it.
05:02Next, the major engine separation begins along with the complete removal of attached components.
05:33Some of the rotten parts were cut up.
05:36A few years after a few years, there are no problems, so we can recognise the nature of the
05:53The fact is that we are not going to imagine the air- Circuit in the city
05:54are not going to attend and they are not going to change the company for the
05:54other than the private sector.
05:54There are two stretings of the building that can damage هنا.
05:57Now, let's put it in close to the building, but we'll see that there are
05:57Now, let's put it in close to the building, and see how it might need to do that.
06:26Brothers, take a look at the overall renovation results.
06:30After these days of thorough disassembly, we can now see that the once P5-018 is badly warmed
06:37with severe coil leaks, and the next step is to disassemble the surface of the engine
06:41and transmission.
07:27This is the end of the day of P5-018.
08:59Heat it to 280 degrees first.
09:08After installing the new steel sleeves, we begin CNC machining of the cylinder block.
11:54Replace all faulty friction plates.
13:53areas, performing one final decreasing before spraying.
14:08Don't forget to like, share, and subscribe, and hit the bell icon to stay updated with
14:14our latest videos.
14:38The full painting process is complete, and after baking, you check the results without
14:43a new polishing.
15:00Next, we move into the full assembly phase, starting by thoroughly cleaning the remaining
15:06parts that were not replaced.
15:10We begin installing the chassis, first replacing the chassis, and then installing the chassis
15:13all the rubber mounts that can be swapped to greatly reduce costs, and then take a look
15:18at the before and after comparison.
15:35So today, we're gonna work together.
15:36Is it something we want to make sure that the chassis is set up?
15:58Next, install the drop-tap.
16:02This will significantly extend the driving range of this 5.0 Discovery.
16:07Here are some quick tips for older vehicles.
16:10Certain parts can be considered for replacement or upgrade, which can greatly improve the overall driving experience.
16:35All the cleaned connectors are thoroughly dried, and after finishing the main wiring, we move on to cleaning the smaller
16:42wires.
17:09To be continued...
17:12...
17:15...
17:19...
17:20...
17:21...
17:24...
17:28...
17:33...
17:34...
17:36...
17:36...
17:38...
17:49...
17:51...
17:51...
17:51...
17:51...
Yorumlar