00:00We have been working on the gate, almost finished.
00:03As you know, the gate of the bridge was not running before.
00:07This time, we have done all the motorization.
00:10All the electronics have been done.
00:12Spinal resting is running, which is almost completed.
00:15The gate has been damaged and repaired.
00:18The structure has been repaired.
00:20For additional protection, we have been wired for 24 feet.
00:24Downstream has been wired for 40 feet.
00:25We have been installed in the entire bridge.
00:28Not only in a small portion, but in all the bridge.
00:31The two sides are in the same direction.
00:33The advanced and old structure, we have done all the work.
00:38The gate of the gate has been removed.
00:39The modernization has been done.
00:41The wiring has been changed.
00:43The control panel has not come.
00:45The testing has been done.
00:47The gate has been done properly.
00:51Sir, let's talk about the level.
00:54How many people are being removed from the gate?
00:56The water is removed from the Dam.
00:58From the Dam, the water is removed from its production.
01:02The water is moved from the Dam.
01:02But in the Dam, the Dam is stored.
01:04There is one called regular 13,000 water.
01:07There is one that uses our irrigation purpose.
01:09The water is used by its irrigation purpose.
01:10The water is used to be used from our Kishmini Kanal.
01:11The water is also used to Punjab.
01:13The water is also used to the PNJ.
01:16The water is used by the PNJ.
01:17I got it.
Comments