Vai al lettorePassa al contenuto principale
  • 4 anni fa
Trascrizione
00:00www.mesmerism.info
00:04With the last 500,000 kilowatt power generation unit officially being put into use, a mega hydropower plant built at
00:11an average altitude of 3,000 meters, the highest one of its kind in China, went fully operational on Friday.
00:18With a planned total installed capacity of 3 million kilowatts, the Lianghe Co hydropower plant is located on the Yaling
00:25River in Tibetan Autonomous Prefecture of Gars, southwest China's Sichuan province.
00:31According to the Yalong River Hydropower Development Company Limited, construction of the project, with an approved investment of 66.5
00:39billion yuan, started in October 2014 and is expected to be fully completed by 2023.
00:45The storage capacity of the reservoir is designed to reach 10.8 billion cubic meters, and the annual power generation
00:52volume is expected to surpass 11 billion kilowatt-hours.
00:57The Yalong River Basin is one of China's clean energy bases.
01:01The operation of the Lianghe Co hydropower plant will help ease imbalanced power generation in Sichuan and promote high-quality
01:08development of the Yangtze Economic Belt and the Chengdu-Chengqing Economic Circle.
01:15The operation of theerting class of the Yulong River was able to pay the Plugin to this program.
01:15The operation of the Yalong River is the use of the blue-hangs, and it is a public component of
01:16the University of China to quarantine.
01:16The operation of the Yalong River, one of the operating systems that is very strong for the recovery of women
01:16spill and women who are qualified in Fortinet light,
01:16The operation of the Yalong River is a negligentary, the need to be a stable major.
01:16The operation of the Yalong River was the electric-house.
01:16The operation of the Yalong River is a very stressful effort to demonstrate that the motorism of the vehicle,
Commenti

Consigliato