00:00In the year 2025, we had a budget of the CM budget
00:05which we had to lift water from the solar valley to the solar valley
00:10and we had to lift water from the solar valley
00:16and we had 3 crores in our camp.
00:21We had a DPR which we had to identify points
00:26we can lift the water
00:28and store the water
00:33during the summer of 3 months
00:35we prepared the water
00:40we lifted the water from 15 hp
00:45and store the water
00:47and usually cement
00:50we made a tank of 1,000,000 liter capacity
00:53which is not so environmentally friendly
00:56and in case there is also a maintenance
01:00so for solving this problem
01:03we have GRP Panel Tanks
01:06which is glass reinforced plastic
01:07which is a composite material
01:08which is connected to net and bolt
01:10and comes into a tank
01:15and its capacity is 1,12,000 liter capacity
01:18and in that we can remove the water level
01:22and the outlet
01:25the maintenance is easy
01:28and its time
01:29and its long time
01:31and its long time
01:31and when the tank is filled with water
01:34after that to take it to the water points
01:37we are using the HP solar motor
01:41and we have identified 26 water points
01:44which are natural water points
01:46which is natural depression
01:48which one a jiv
01:50prepares the water
01:51so in that point
01:52we have water
01:55and the longest point
01:58we have moved about
01:59as much as possible
01:59is 12 km
02:01which is nearly as it can
02:04and we have filled the water
02:05which is nearly
02:05than 38 km pipeline
02:07We have put 38 km pipeline in this project.
02:13In Madhya Pradesh and Rajasthan, they are definitely the most distant area
02:17where the water is taken from the lake.
02:21So that is the project.
02:23In the wildlife areas, most of the time, we have made cement tankies.
02:29This is the first experiment that we have made from this tankies.
02:32Here we go.