00:00Half-Long Town Water Supply Scheme
00:02has been made in the
00:04and there is a lot of
00:06the crisis in the HALF-Long
00:08and there is a great project
00:12and first of all,
00:15I will give you
00:18the Chief Minister
00:19Dr. Hemanthropy Sharma Ji
00:21to give me the advice
00:22because
00:22the initiative
00:25and the
00:27the problem of the
00:30the 100 cross
00:32the HALF-Long Town Water Supply Scheme
00:35has been given
00:37and has been given
00:39and this
00:40is a dream
00:43but in some cases
00:46it is going to be true
00:47and after this project
00:50is completed
00:50after
00:55the crisis
00:57it has been
00:59that it will solve
00:59and
01:00then
01:01this project
01:02is completed
01:03and
01:03the temporary solution
01:07needs
01:08we are doing
01:19in the
01:20the
01:21the
01:21one
01:21the
01:22the
01:22one
01:22the
01:37one
01:39one
01:42We will have a permanent solution for this year, and we will have a permanent solution for this year.
01:48This crisis is a crisis.
01:52This project has been a long time for implementing this project,
01:56since MD has already said before.
02:04the design of the project and the design of the project has been studied and has been
02:13studied.
02:13The project is the success of the project.
02:21I think it will not be successful if it will not be successful, then it will be a loss to
02:31the government.
02:33It will also be difficult to get the process and the process of this project.
02:43The project has been started in the beginning.
02:44And now, we've heard about the pipeline first,
02:49the DPIIT was approved.
02:52And the treatment plan was also been modified.
02:59There were some added.
03:01As you can see, there were some added.
03:06The Department of Housing and Urban Affairs of Hamor
03:10which is a half-long water supply project that I have done here.
03:14The Honourable C.E.M., Sir, said that my Honourable Minister said that
03:18that the water supply has come from here.
03:21And this half-long water supply project is very important.
03:25I have done a lot with central government funding,
03:28which I have to benefit from around 10,000 households.
03:31And I have put a pipe in 70.25 km.
03:34I have put a pipe in 7 million liters per day
03:38and I have put water treatment plan.
03:40So, in this case, I can cover the water supply.
03:43I will cover the water supply.
03:47I will cover the water supply.
03:48I will cover the water supply.
03:50I will cover the water supply.
03:54How do you do this project?
03:58I have done a contract with two years.
04:05How do you do this project?
04:07I actually started with the water supply.
04:07So, if you are not ready for two years,
04:13I will cover up as a liquid energy.
04:17If you are ready for a good life,
04:19you will cover it all in the vagina space.
04:21Why do you do this project?
04:25How do you do this project?
04:25What is your work that you do?
04:26I am working with our main project.
04:29So, what is your work that you do?
04:31So, we have a successful scheme for IIT, so that we can get successful scheme.
04:37How much cost?
04:39100.63 crores.
04:42And we have the past cost, operation and maintenance.
04:46So, we have the same contract for the past cost, operation and maintenance.
04:52How much connection is there?
05:07Make the difference between the line period, the main line period.
05:12Line period is the value of the project.
05:15I can get to the point in this field, with CFO, TPO, IIT, and I can get from the point
05:27on this side.
05:30the water treatment plant is made by water treatment plant.
05:38This technique is not said that if the water is 100% confirmed,
05:41the technology is not done.