00:00In October 2020, Calico Dome has been installed in the Standing Committee and has been installed in the Standing Committee and has been installed in the Standing Committee and has been installed in the Standing Committee.
00:13There is a structure of the construction, but the design is a specific and high court order.
00:21There is a structure of the construction, which has been installed in the Standing Committee and has been installed in the Standing Committee and has been installed in the Standing Committee.
00:44There is a structure of the construction and has been installed in the Standing Committee and is installed in the Standing Committee.
00:54It is a design and CNC machine used to design from its design of the ten rear triangle panel for the Pryos up to epoxy adhesive and can be installed in it.
01:13Everything is a precise work.
01:17There is a panel that is prepared.
01:19PMC is checked by design.
01:23The design is approved by the design.
01:26The design is made by the material.
01:32There is a material like plywood sheet,
01:33a material like a cover sheet,
01:34rivet adhesive.
01:36There are all kinds of things.
01:39There is a material like a clay.
01:42The metal structure is ready to be made
01:47The copper sheet is critical of the design
01:53But the design is one by one
01:57And we have realized that
02:00In the last half of the month,
02:03we have to do this
02:05This will become great for people who have taken the form of the background.
02:11Because of this contract, this year we were actually doing a consulting company.
02:19Such as, there is a very unique design academy,
02:23because it has been a very precise material and a precise design,
02:28so when we make a job like this contract, we have developed a job.
02:32We've rejected it and we've rejected it, and we've rejected it.
02:36So, this project has been delayed.
02:39And we've rejected our design consultant and the contractor.
02:45And we've rejected it in the last month.
Comments