De-shuttering is a form-work removal process, which is based on practical standards set in the construction industry. If proper period is not provided with the supports (shuttering in position) then there are chances of repercussions and reduced performance of concrete.
In the short video, specified period required for curing is mentioned and dis-advantages of early removal of form-works are mentioned.
Other useful Videos; -Estimation- - Estimation of Quantities for a residential building https://dai.ly/x7vkdlu
-Structural- - Load Distribution Pattern of a Building https://dai.ly/x7vc4mo
- Simplified building structural design https://dai.ly/x7v8bgn
- Structural support conditions and rebar detailing https://dai.ly/x7v1yn8
- Structural Design Basics for Beginners https://dai.ly/x7v1utv
Be the first to comment