Do you want to remove all your recent searches?

All recent searches will be deleted

Like
Watch Later
Share
Add to

Demolition of Space Shuttle Launch Pad 39-B

6 years ago196 views

spacevidsnet

SpaceVids

At NASA's Kennedy Space Center in Florida, the fixed service structure (FSS) and rotating service structure (RSS) from Launch Pad 39B have been removed.

The FSS and RSS were designed to support the unique needs of the Space Shuttle Program. In 2009, the pad was no longer needed for the shuttle program, so it is being restructured for future use. Its new design will feature a "clean pad" for rockets to come with their own launcher, making it more versatile for a number of vehicles. The transformation also includes the refurbishment of the liquid oxygen and liquid hydrogen tanks and the upgrade of about 1.3 million feet of cable. The new lightning protection system, which was in place for the October 2009 launch of Ares I-X, will remain.

Report this video

Select an issue

Embed the video

Demolition of Space Shuttle Launch Pad 39-B
Autoplay
<iframe frameborder="0" width="480" height="270" src="//www.dailymotion.com/embed/video/xrttd3" allowfullscreen allow="autoplay"></iframe>
Add the video to your site with the embed code above